Skip to content
LexBuild

7 CFR § 1726.22 - Methods of construction.

---
identifier: "/us/cfr/t7/s1726.22"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "7 CFR § 1726.22 - Methods of construction."
title_number: 7
title_name: "Agriculture"
section_number: "1726.22"
section_name: "Methods of construction."
chapter_name: "RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE"
part_number: "1726"
part_name: "ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "7 U.S.C. 901  1921  6941"
regulatory_source: "60 FR 10155, Feb. 23, 1995, unless otherwise noted."
cfr_part: "1726"
---

# 1726.22 Methods of construction.

The borrower is generally responsible for determining whether construction will be by contract or force account. If construction is by contract, the borrower must determine whether materials will be supplied by the contractor or will be furnished by the borrower. RUS reserves the right to require contract construction in lieu of force account construction on a case by case basis.