Skip to content
LexBuild

10 CFR § 963.10 - Scope.

---
identifier: "/us/cfr/t10/s963.10"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "10 CFR § 963.10 - Scope."
title_number: 10
title_name: "Energy"
section_number: "963.10"
section_name: "Scope."
chapter_name: "DEPARTMENT OF ENERGY"
part_number: "963"
part_name: "YUCCA MOUNTAIN SITE SUITABILITY GUIDELINES"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "42 U.S.C. 2011  42 U.S.C. 7101  42 U.S.C. 10101,"
regulatory_source: "66 FR 57336, Nov. 14, 2001, unless otherwise noted."
cfr_part: "963"
---

# 963.10 Scope.

(a) The scope of this subpart includes the following for both the preclosure and postclosure periods:

(1) The bases for the suitability determination for the Yucca Mountain site as a location for a geologic repository;

(2) The suitability evaluation methods for applying the site suitability criteria to a geologic repository at the Yucca Mountain site; and

(3) The site suitability criteria that DOE will apply in accordance with section 113(b)(1)(A)(iv) of the NWPA.

(b) DOE will seek NRC concurrence on any future revisions to this subpart.