Skip to content
LexBuild

23 CFR § 636.208 - May I use my existing prequalification procedures with design-build contracts?

---
identifier: "/us/cfr/t23/s636.208"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "23 CFR § 636.208 - May I use my existing prequalification procedures with design-build contracts?"
title_number: 23
title_name: "Highways"
section_number: "636.208"
section_name: "May I use my existing prequalification procedures with design-build contracts?"
chapter_name: "FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION"
subchapter_number: "G"
subchapter_name: "ENGINEERING AND TRAFFIC OPERATIONS"
part_number: "636"
part_name: "DESIGN-BUILD CONTRACTING"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "Sec. 1503 of Pub. L. 109-59, 119 Stat. 1144; Sec. 1307 of Pub. L. 105-178, 112 Stat. 107; 23 U.S.C. 101, 109, 112, 113, 114, 115, 119, 128, and 315; 49 CFR 1.48(b)."
regulatory_source: "67 FR 75926, Dec. 10, 2002, unless otherwise noted."
cfr_part: "636"
---

# 636.208 May I use my existing prequalification procedures with design-build contracts?

Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.