Skip to content
LexBuild

30 CFR § 57.6600 - Loading practices.

---
identifier: "/us/cfr/t30/s57.6600"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "30 CFR § 57.6600 - Loading practices."
title_number: 30
title_name: "Mineral Resources"
section_number: "57.6600"
section_name: "Loading practices."
chapter_name: "MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR"
subchapter_number: "K"
subchapter_name: "METAL AND NONMETAL MINE SAFETY AND HEALTH"
part_number: "57"
part_name: "SAFETY AND HEALTH STANDARDS—UNDERGROUND METAL AND NONMETAL MINES"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 811."
regulatory_source: "50 FR 4082, Jan. 29, 1985, unless otherwise noted."
cfr_part: "57"
---

# 57.6600 Loading practices.

If extraneous electricity is suspected in an area where electric detonators are used, loading shall be suspended until tests determine that stray current does not exceed 0.05 amperes through a 1-ohm resister when measured at the location of the electric detonators. If greater levels of extraneous electricity are found, the source shall be determined and no loading shall take place until the condition is corrected.