Skip to content
LexBuild

30 CFR § 77.704-1 - Work on high-voltage lines.

---
identifier: "/us/cfr/t30/s77.704-1"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "30 CFR § 77.704-1 - Work on high-voltage lines."
title_number: 30
title_name: "Mineral Resources"
section_number: "77.704-1"
section_name: "Work on high-voltage lines."
chapter_name: "MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR"
subchapter_number: "O"
subchapter_name: "COAL MINE SAFETY AND HEALTH"
part_number: "77"
part_name: "MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 811."
regulatory_source: "36 FR 9364, May 22, 1971, unless otherwise noted."
cfr_part: "77"
---

# 77.704-1 Work on high-voltage lines.

(a) No high-voltage line shall be regarded as deenergized for the purpose of performing work on it, until it has been determined by a qualified person (as provided in § 77.103) that such high-voltage line has been deenergized and grounded. Such qualified person shall by visual observation (1) determine that the disconnecting devices on the high-voltage circuit are in open position, and (2) insure that each ungrounded conductor of the high-voltage circuit upon which work is to be done is properly connected to the system grounding medium. In the case of resistance grounded or solid wye-connected systems, the neutral wire is the system grounding medium. In the case of an ungrounded power system, either the steel armor or conduit enclosing the system or a surface grounding field is a system grounding medium;

(b) No work shall be performed on any high-voltage line which is supported by any pole or structure which also supports other high-voltage lines until: (1) All lines supported on the pole or structure are deenergized and grounded in accordance with all of the provisions of this § 77.704-1 which apply to the repair of deenergized surface high-voltage lines; or (2) the provisions of §§ 77.704-2 through 77.704-10 have been complied with, with respect to all energized lines, which are supported on the pole or structure.

(c) Work may be performed on energized surface high-voltage lines only in accordance with the provisions of §§ 77.704-2 through 77.704-10, inclusive.