Skip to content
LexBuild

30 CFR § 203.47 - What administrative steps do I take to obtain and use the royalty suspension supplement?

---
identifier: "/us/cfr/t30/s203.47"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "30 CFR § 203.47 - What administrative steps do I take to obtain and use the royalty suspension supplement?"
title_number: 30
title_name: "Mineral Resources"
section_number: "203.47"
section_name: "What administrative steps do I take to obtain and use the royalty suspension supplement?"
chapter_name: "BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR"
subchapter_number: "A"
subchapter_name: "MINERALS REVENUE MANAGEMENT"
part_number: "203"
part_name: "RELIEF OR REDUCTION IN ROYALTY RATES"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "25 U.S.C. 396  25 U.S.C. 396a  25 U.S.C. 2101  30 U.S.C. 181  30 U.S.C. 351  30 U.S.C. 1001  30 U.S.C. 1701  31 U.S.C. 9701; 42 U.S.C. 15903-15906; 43 U.S.C. 1301  43 U.S.C. 1331  and 43 U.S.C. 1801"
regulatory_source: "76 FR 64462, Oct. 18, 2011, unless otherwise noted."
cfr_part: "203"
---

# 203.47 What administrative steps do I take to obtain and use the royalty suspension supplement?

(a) Before you start drilling a well on your lease targeted to a reservoir at least 18,000 feet TVD SS, you must notify, in writing, the BSEE Regional Supervisor for Production and Development of your intent to begin drilling operations and the depth of the target.

(b) After drilling the well, you must provide the BSEE Regional Supervisor for Production and Development within 60 days after reaching the total depth in your well:

(1) Information that allows BSEE to confirm that you drilled a certified unsuccessful well as defined under § 203.0, including:

(i) Well log data, if your original well or sidetrack does not meet the producibility requirements of 30 CFR part 550, subpart A; or

(ii) Well log, well test, seismic, and economic data, if your well does meet the producibility requirements of 30 CFR part 550, subpart A; and

(2) Information that allows BSEE to confirm the size of the royalty suspension supplement for a sidetrack, including sidetrack measured depth and supporting documentation.

(c) If you commenced drilling a well that otherwise meets the criteria for a certified unsuccessful well on a lease located entirely in more than 200 meters and entirely less than 400 meters of water on or after May 18, 2007, and finished it before December 18, 2008, you must provide the information in paragraph (b) of this section no later than February 17, 2009.