33 CFR § 117.609 - Mystic River.
---
identifier: "/us/cfr/t33/s117.609"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "33 CFR § 117.609 - Mystic River."
title_number: 33
title_name: "Navigation and Navigable Waters"
section_number: "117.609"
section_name: "Mystic River."
chapter_name: "COAST GUARD, DEPARTMENT OF HOMELAND SECURITY"
subchapter_number: "J"
subchapter_name: "BRIDGES"
part_number: "117"
part_name: "DRAWBRIDGE OPERATION REGULATIONS"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "33 U.S.C. 499; 33 CFR 1.05-1; and DHS Delegation No. 00170.1, Revision No. 01.4."
regulatory_source: "CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted."
cfr_part: "117"
---
# 117.609 Mystic River.
The draw of the S99 Alford Street Bridge, mile 1.4, shall open on signal; except that, Monday through Saturday, excluding holidays, the draw need not open for the passage of vessel traffic from 7:45 a.m. to 9 a.m., 9:10 a.m. to 10 a.m., and 5 p.m. to 6 p.m., daily. From November 1 through March 31, between 3 p.m. and 7 a.m., at least an eight-hour advance notice is required for bridge openings by calling the number posted at the bridge.
[USCG-2018-0443, 83 FR 30039, June 27, 2018]