Skip to content
LexBuild

33 CFR § 150.405 - How must a cargo transfer system be tested and inspected?

---
identifier: "/us/cfr/t33/s150.405"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "33 CFR § 150.405 - How must a cargo transfer system be tested and inspected?"
title_number: 33
title_name: "Navigation and Navigable Waters"
section_number: "150.405"
section_name: "How must a cargo transfer system be tested and inspected?"
chapter_name: "COAST GUARD, DEPARTMENT OF HOMELAND SECURITY"
subchapter_number: "NN"
subchapter_name: "DEEPWATER PORTS"
part_number: "150"
part_name: "DEEPWATER PORTS: OPERATIONS"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "33 U.S.C. 1321(j)(1)(C), (j)(5), (j)(6), (m)(2), 1509(a); 46 U.S.C. 70034; E.O. 12777, sec. 2; E.O. 13286, sec. 34, 68 FR 10619; Department of Homeland Security Delegation No. 0170.1."
regulatory_source: "USCG-1998-3884, 71 FR 57651, Sept. 29, 2006, unless otherwise noted."
cfr_part: "150"
---

# 150.405 How must a cargo transfer system be tested and inspected?

(a) No person may transfer oil or natural gas through a cargo transfer system (CTS) at a deepwater port unless it has been inspected and tested according to this section.

(b) The single point mooring (SPM)-CTS must be maintained as required by the design standards used to comply with § 149.650 of this chapter.

(c) If the manufacturer's maximum pressure rating for any cargo transfer hose in a SPM-CTS has been exceeded, unless it was exceeded for testing required by this section, the hose must be:

(1) Removed;

(2) Hydrostatically tested to 1.5 times its maximum working pressure for oil, or 1.1 times its maximum working pressure for natural gas; and

(3) Visually examined externally and internally for evidence of:

(i) Leakage;

(ii) Loose covers;

(iii) Kinks;

(iv) Bulges;

(v) Soft spots; and

(vi) Gouges, cuts, or slashes that penetrate the hose reinforcement.

(d) Each submarine hose used in cargo transfer operations in an SPM-CTS must have been removed from its coupling, surfaced, and examined as described in paragraphs (c)(2) and (c)(3) of this section, within the preceding 2 years for oil, or 15 months for natural gas; and

(e) Before resuming cargo transfer operations, each submarine hose in an SPM-CTS must be visually examined in place as described in paragraph (c)(3) of this section after cargo transfer operations are shut down due to sea conditions at the deepwater port.