Skip to content
LexBuild

36 CFR § 9.83 - What information must be included in all applications?

---
identifier: "/us/cfr/t36/s9.83"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "36 CFR § 9.83 - What information must be included in all applications?"
title_number: 36
title_name: "Parks, Forests, and Public Property"
section_number: "9.83"
section_name: "What information must be included in all applications?"
chapter_name: "NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR"
part_number: "9"
part_name: "MINERALS MANAGEMENT"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
cfr_part: "9"
---

# 9.83 What information must be included in all applications?

All applications must include the information required by this section.

| All operations permit applications must include information on . . . | and must include the following detailed information . . . |
| --- | --- |
| (a) Ownership | documentation demonstrating that you hold a right, and the extent of such right, to operate within the System unit. |
| (b) The owner/operator | names, addresses, and other contact information for:(1) The operator;(2) The owner;(3) Any agents, assignees, designees, contractors, or other representatives of the operator including those responsible for overall management, field supervision, and emergency response of the proposed operations. |
| (c) Existing conditions and proposed area of operations | all the information required by § 9.84. |
| (d) Reclamation plan | (1) A description of the equipment and methods used to meet the operating standards for reclamation at § 9.116; and(2) A breakdown of the estimated costs that a third party would charge to complete reclamation as proposed in your reclamation plan. |
| (e) Use of water | (1) The source (including documentation verifying a water right), quantity, access route, and transportation/conveyance method for all water to be used in access road and pad construction, well drilling, stimulation, and production; and(2) Estimations of any anticipated waste water volumes generated and how they will be managed (i.e. handled, temporary stored, disposed, recycled, reused) throughout stages of the operation. |
| (f) Environmental conditions and mitigation actions | all the information required by § 9.85. |
| (g) The spill control and emergency preparedness plan | all the information required by § 9.86. |