Skip to content
LexBuild

40 CFR § 230.77 - Other actions.

---
identifier: "/us/cfr/t40/s230.77"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "40 CFR § 230.77 - Other actions."
title_number: 40
title_name: "Protection of Environment"
section_number: "230.77"
section_name: "Other actions."
chapter_name: "ENVIRONMENTAL PROTECTION AGENCY"
subchapter_number: "H"
subchapter_name: "OCEAN DUMPING"
part_number: "230"
part_name: "SECTION 404(b)(1) GUIDELINES FOR SPECIFICATION OF DISPOSAL SITES FOR DREDGED OR FILL MATERIAL"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "33 U.S.C. 1251"
regulatory_source: "45 FR 85344, Dec. 24, 1980, unless otherwise noted."
cfr_part: "230"
---

# 230.77 Other actions.

(a) In the case of fills, controlling runoff and other discharges from activities to be conducted on the fill;

(b) In the case of dams, designing water releases to accommodate the needs of fish and wildlife;

(c) In dredging projects funded by Federal agencies other than the Corps of Engineers, maintain desired water quality of the return discharge through agreement with the Federal funding authority on scientifically defensible pollutant concentration levels in addition to any applicable water quality standards;

(d) When a significant ecological change in the aquatic environment is proposed by the discharge of dredged or fill material, the permitting authority should consider the ecosystem that will be lost as well as the environmental benefits of the new system.