Title 40, Part 270 — EPA Administered Permit Programs: the Hazardous Waste Permit Program
94 sections
Section 270.1
Purpose and scope of the regulations in this part.
Section 270.2
Definitions.
Section 270.3
Considerations under Federal law.
Section 270.4
Effect of a permit.
Section 270.5
Noncompliance and program reporting by the Director.
Section 270.6
References.
Section 270.10
General application requirements.
Section 270.11
Signatories to permit applications and reports.
Section 270.12
Confidentiality of information.
Section 270.13
Contents of part A of the permit application.
Section 270.14
Contents of part B: General requirements.
Section 270.15
Specific part B information requirements for containers.
Section 270.16
Specific part B information requirements for tank systems.
Section 270.17
Specific part B information requirements for surface impoundments.
Section 270.18
Specific part B information requirements for waste piles.
Section 270.19
Specific part B information requirements for incinerators.
Section 270.20
Specific part B information requirements for land treatment facilities.
Section 270.21
Specific part B information requirements for landfills.
Section 270.22
Specific part B information requirements for boilers and industrial furnaces burning hazardous waste.
Section 270.23
Specific part B information requirements for miscellaneous units.
Section 270.24
Specific part B information requirements for process vents.
Section 270.25
Specific part B information requirements for equipment.
Section 270.26
Special part B information requirements for drip pads.
Section 270.27
Specific Part B information requirements for air emission controls for tanks, surface impoundments, and containers.
Section 270.28
Part B information requirements for post-closure permits.
Section 270.29
Permit denial.
Section 270.30
Conditions applicable to all permits.
Section 270.31
Requirements for recording and reporting of monitoring results.
Section 270.32
Establishing permit conditions.
Section 270.33
Schedules of compliance.
Section 270.40
Transfer of permits.
Section 270.41
Modification or revocation and reissuance of permits.
Section 270.42
Permit modification at the request of the permittee.
Section 270.43
Termination of permits.
Section 270.50
Duration of permits.
Section 270.51
Continuation of expiring permits.
Section 270.60
Permits by rule.
Section 270.61
Emergency permits.
Section 270.62
Hazardous waste incinerator permits.
Section 270.63
Permits for land treatment demonstrations using field test or laboratory analyses.
Section 270.64
Interim permits for UIC wells.
Section 270.65
Research, development, and demonstration permits.
Section 270.66
Permits for boilers and industrial furnaces burning hazardous waste.
Section 270.67
RCRA standardized permits for storage and treatment units.
Section 270.68
Remedial Action Plans (RAPs).
Section 270.70
Qualifying for interim status.
Section 270.71
Operation during interim status.
Section 270.72
Changes during interim status.
Section 270.73
Termination of interim status.
Section 270.79
Why is this subpart written in a special format?
Section 270.80
What is a RAP?
Section 270.85
When do I need a RAP?
Section 270.90
Does my RAP grant me any rights or relieve me of any obligations?
Section 270.95
How do I apply for a RAP?
Section 270.100
Who must obtain a RAP?
Section 270.105
Who must sign the application and any required reports for a RAP?
Section 270.110
What must I include in my application for a RAP?
Section 270.115
What if I want to keep this information confidential?
Section 270.120
To whom must I submit my RAP application?
Section 270.125
If I submit my RAP application as part of another document, what must I do?
Section 270.130
What is the process for approving or denying my application for a RAP?
Section 270.135
What must the Director include in a draft RAP?
Section 270.140
What else must the Director prepare in addition to the draft RAP or notice of intent to deny?
Section 270.145
What are the procedures for public comment on the draft RAP or notice of intent to deny?
Section 270.150
How will the Director make a final decision on my RAP application?
Section 270.155
May the decision to approve or deny my RAP application be administratively appealed?
Section 270.160
When does my RAP become effective?
Section 270.165
When may I begin physical construction of new units permitted under the RAP?
Section 270.170
After my RAP is issued, how may it be modified, revoked and reissued, or terminated?
Section 270.175
For what reasons may the Director choose to modify my final RAP?
Section 270.180
For what reasons may the Director choose to revoke and reissue my final RAP?
Section 270.185
For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?
Section 270.190
May the decision to approve or deny a modification, revocation and reissuance, or termination of my RAP be administratively appealed?
Section 270.195
When will my RAP expire?
Section 270.200
How may I renew my RAP if it is expiring?
Section 270.205
What happens if I have applied correctly for a RAP renewal but have not received approval by the time my old RAP expires?
Section 270.210
What records must I maintain concerning my RAP?
Section 270.215
How are time periods in the requirements in this subpart and my RAP computed?
Section 270.220
How may I transfer my RAP to a new owner or operator?
Section 270.225
What must the State or EPA Region report about noncompliance with RAPs?
Section 270.230
May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated?
Section 270.235
Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid fuel boilers and hydrochloric acid production furnaces to minimize emissions from startup, shutdown, and malfunction events.
Section 270.250
What is a RCRA standardized permit?
Section 270.255
Who is eligible for a standardized permit?
Section 270.260
What requirements of part 270 apply to a standardized permit?
Section 270.270
How do I apply for a standardized permit?
Section 270.275
What information must I submit to the permitting agency to support my standardized permit application?
Section 270.280
What are the certification requirements?
Section 270.290
What general types of information must I keep at my facility?
Section 270.300
What container information must I keep at my facility?
Section 270.305
What tank information must I keep at my facility?
Section 270.310
What equipment information must I keep at my facility?
Section 270.315
What air emissions control information must I keep at my facility?
Section 270.320
How do I modify my RCRA standardized permit?