Skip to content
LexBuild

40 CFR § 35.2116 - Collection system.

---
identifier: "/us/cfr/t40/s35.2116"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "40 CFR § 35.2116 - Collection system."
title_number: 40
title_name: "Protection of Environment"
section_number: "35.2116"
section_name: "Collection system."
chapter_name: "ENVIRONMENTAL PROTECTION AGENCY"
subchapter_number: "B"
subchapter_name: "GRANTS AND OTHER FEDERAL ASSISTANCE"
part_number: "35"
part_name: "STATE AND LOCAL ASSISTANCE"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "42 U.S.C. 7401  33 U.S.C. 1251  42 U.S.C. 300f  42 U.S.C. 6901  7 U.S.C. 136  15 U.S.C. 2601  42 U.S.C. 13101  Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200."
cfr_part: "35"
---

# 35.2116 Collection system.

Except as provided in § 35.2032(c), if the project involves collection system work, such work:

(a) Shall be for the replacement or major rehabilitation of an existing collection system which was not build with Federal funds awarded on or after October 18, 1972, and shall be necessary to the integrity and performance of the complete waste treatment system; or

(b) Shall be for a new cost-effective collection system in a community in existence on October 18, 1972, which has sufficient existing or planned capacity to adequately treat such collected wastewater and where the bulk (generally two-thirds) of the expected flow (flow from existing plus future residential users) will be from the resident population on October 18, 1972. The expected flow will be subject to the limitations for interceptors contained in § 35.2123. If assistance is awarded, the grantee shall provide assurances that the existing population will connect to the collection system within a reasonable time after project completion.