# 53.2 General requirements for a reference method determination.
The following general requirements for a Federal reference method (FRM) determination are summarized in table A-1 of this subpart.
(a) *Manual methods*—(1) *Sulfur dioxide (SO*<sub>2</sub>) and Lead. For measuring SO<sub>2</sub> and lead, appendixes A-2 and G of part 50 of this chapter specify unique manual FRM for measuring those pollutants. Except as provided in § 53.16, other manual methods for lead will not be considered for a reference method determination under this part.
(2) *PM*<sub>10</sub>. A FRM for measuring PM <sub>10</sub> must be a manual method that meets all requirements specified in appendix J of part 50 of this chapter and must include a PM <sub>10</sub> sampler that has been shown in accordance with this part to meet all requirements specified in this subpart A and subpart D of this part.
(3) *PM*<sub>2.5</sub>. A FRM for measuring PM <sub>2.5</sub> must be a manual method that meets all requirements specified in appendix L of part 50 of this chapter and must include a PM <sub>2.5</sub> sampler that has been shown in accordance with this part to meet the applicable requirements specified in this subpart A and subpart E of this part. Further, FRM samplers must be manufactured in an ISO 9001-registered facility, as defined in § 53.1 and as set forth in § 53.51.
(4) *PM*<sub>10-2.5</sub>. A FRM for measuring PM <sub>10-2.5</sub> must be a manual method that meets all requirements specified in appendix O of part 50 of this chapter and must include PM <sub>10C</sub> and PM <sub>2.5</sub> samplers that have been shown in accordance with this part to meet the applicable requirements specified in this subpart A and subpart E of this part. Further, PM <sub>10-2.5</sub> FRM samplers must be manufactured in an ISO 9001-registered facility, as defined in § 53.1 and as set forth in § 53.51.
(b) *Automated methods.* An automated FRM for measuring SO<sub>2</sub>, CO, O<sub>3</sub>, or NO<sub>2</sub> must utilize the measurement principle and calibration procedure specified in the appropriate appendix to part 50 of this chapter (appendix A-1 only for SO<sub>2</sub> methods) and must have been shown in accordance with this part to meet the requirements specified in this subpart A and subpart B of this part.
[71 FR 61271, Oct. 17, 2006, as amended at 75 FR 35597, June 22, 2010]