Skip to content
LexBuild

43 CFR § 3162.2-11 - How soon after I know of the likelihood of drainage must I take protective action?

---
identifier: "/us/cfr/t43/s3162.2-11"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "43 CFR § 3162.2-11 - How soon after I know of the likelihood of drainage must I take protective action?"
title_number: 43
title_name: "Public Lands: Interior"
section_number: "3162.2-11"
section_name: "How soon after I know of the likelihood of drainage must I take protective action?"
chapter_name: "BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR"
subchapter_number: "C"
subchapter_name: "MINERALS MANAGEMENT (3000)"
part_number: "3160"
part_name: "ONSHORE OIL AND GAS OPERATIONS"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "25 U.S.C. 396d and 2107; 30 U.S.C. 189, 306, 359, and 1751; 43 U.S.C. 1732(b), 1733, 1740; and Sec. 107, Pub. L. 114-74, 129 Stat. 599, unless otherwise noted."
regulatory_source: "47 FR 47765, Oct. 27, 1982, unless otherwise noted. Redesignated at 48 FR 36583, Aug. 12, 1983."
cfr_part: "3160"
---

# 3162.2-11 How soon after I know of the likelihood of drainage must I take protective action?

(a) You must take protective action within a reasonable time after the earlier of:

(1) The date you knew or had constructive notice that the potentially draining well had begun to produce oil or gas; or

(2) The date we issued a demand letter for protective action.

(b) Since the time required to drill and produce a protective well varies according to the location and conditions of the oil and gas reservoir, BLM will determine this on a case-by-case basis. When we determine whether you took protective action within a reasonable time, we will consider several factors including, but not limited to:

(1) Time required to evaluate the characteristics and performance of the draining well;

(2) Rig availability;

(3) Well depth;

(4) Required environmental analysis;

(5) Special lease stipulations which provide limited time frames in which to drill; and

(6) Weather conditions.

(c) If BLM determines that you did not take protection action timely, you will owe compensatory royalty for the period of the delay under § 3162.2-12.