Skip to content
LexBuild

43 CFR § 3175.100 - Electronic gas measurement (secondary and tertiary device).

---
identifier: "/us/cfr/t43/s3175.100"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "43 CFR § 3175.100 - Electronic gas measurement (secondary and tertiary device)."
title_number: 43
title_name: "Public Lands: Interior"
section_number: "3175.100"
section_name: "Electronic gas measurement (secondary and tertiary device)."
chapter_name: "BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR"
subchapter_number: "C"
subchapter_name: "MINERALS MANAGEMENT (3000)"
part_number: "3170"
part_name: "ONSHORE OIL AND GAS PRODUCTION"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "25 U.S.C. 396d and 2107; 30 U.S.C. 189, 306, 359, and 1751; and 43 U.S.C. 1732(b), 1733, and 1740."
regulatory_source: "81 FR 81421, Nov. 17, 2016, unless otherwise noted."
cfr_part: "3170"
---

# 3175.100 Electronic gas measurement (secondary and tertiary device).

Except as stated in this section, as prescribed in Table 1 to this section, or grandfathered under § 3175.61, the standards and requirements in this section apply to all EGM systems used at FMPs (Note: The following table lists the standards in this subpart and the API standards that the operator must follow to install and maintain EGM systems. A requirement applies when a column is marked with an “x” or a number.).