Skip to content
LexBuild

43 CFR § 3274.11 - What must I give BLM to approve my commercial use permit application?

---
identifier: "/us/cfr/t43/s3274.11"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "43 CFR § 3274.11 - What must I give BLM to approve my commercial use permit application?"
title_number: 43
title_name: "Public Lands: Interior"
section_number: "3274.11"
section_name: "What must I give BLM to approve my commercial use permit application?"
chapter_name: "BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR"
subchapter_number: "C"
subchapter_name: "MINERALS MANAGEMENT (3000)"
part_number: "3200"
part_name: "GEOTHERMAL RESOURCE LEASING"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 1001-1028; 43 U.S.C. 1701  and Pub. L. 109-58."
regulatory_source: "72 FR 24400, May 2, 2007, unless otherwise noted."
cfr_part: "3200"
---

# 3274.11 What must I give BLM to approve my commercial use permit application?

Submit a completed and signed commercial permit form, to BLM, containing the following information:

(a) The design specifications, and the inspection and calibration schedule of production, injection, and royalty meters;

(b) A schematic diagram of the utilization site or individual well, showing the location of each production and royalty meter. If the sales point is located off the utilization site, give us a generalized schematic diagram of the electrical transmission or pipeline system, including meter locations;

(c) A copy of the sales contract for the sale and/or utilization of geothermal resources;

(d) A description and analysis of reservoir, production, and injection characteristics, including the flow rates, temperatures, and pressures of each production and injection well;

(e) A schematic diagram of each production and injection well showing the wellhead configuration, including meters;

(f) A schematic flow diagram of the utilization facility, including interconnections with other facilities, if applicable;

(g) A description of the utilization process in sufficient detail to enable BLM to determine whether the resource will be utilized in a manner consistent with law and regulations;

(h) The planned safety provisions for emergency shutdown to protect public health, safety, property, and the environment. This should include a schedule for the testing and maintenance of safety devices;

(i) The environmental and operational parameters that will be monitored during the operation of the facility and/or well(s); and

(j) Any additional information or data that we may require.