43 CFR § 3275.13 - How must the facility operator measure the geothermal resources?
---
identifier: "/us/cfr/t43/s3275.13"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "43 CFR § 3275.13 - How must the facility operator measure the geothermal resources?"
title_number: 43
title_name: "Public Lands: Interior"
section_number: "3275.13"
section_name: "How must the facility operator measure the geothermal resources?"
chapter_name: "BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR"
subchapter_number: "C"
subchapter_name: "MINERALS MANAGEMENT (3000)"
part_number: "3200"
part_name: "GEOTHERMAL RESOURCE LEASING"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 1001-1028; 43 U.S.C. 1701 and Pub. L. 109-58."
regulatory_source: "72 FR 24400, May 2, 2007, unless otherwise noted."
cfr_part: "3200"
---
# 3275.13 How must the facility operator measure the geothermal resources?
The facility operator must:
(a) Measure all production, injection and utilization in accordance with methods and standards approved by BLM (see § 3275.15);
(b) Maintain and test all metering equipment. If your equipment is defective or out of tolerance, you must promptly recalibrate, repair, or replace it; and
(c) Determine the amount of production and/or utilization in accordance with methods and procedures approved by BLM (see § 3275.17).