Skip to content
LexBuild

46 CFR § 167.15-35 - Notice and plans required.

---
identifier: "/us/cfr/t46/s167.15-35"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "46 CFR § 167.15-35 - Notice and plans required."
title_number: 46
title_name: "Shipping"
section_number: "167.15-35"
section_name: "Notice and plans required."
chapter_name: "COAST GUARD, DEPARTMENT OF HOMELAND SECURITY"
subchapter_number: "R"
subchapter_name: "NAUTICAL SCHOOLS"
part_number: "167"
part_name: "PUBLIC NAUTICAL SCHOOL SHIPS"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "46 U.S.C. 3306, 3307, 6101, 8105; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; DHS Delegation 00170.1, Revision No. 01.4."
regulatory_source: "CGFR 51-11, 16 FR 3218, Apr. 12, 1951, unless otherwise noted."
cfr_part: "167"
---

# 167.15-35 Notice and plans required.

(a) The master, owner, operator, or agent of the vessel shall notify the Officer in Charge, Marine Inspection, whenever the vessel is to be drydocked regardless of the reason for drydocking.

(b) Each vessel, except barges, that holds a Load Line Certificate must have on board a plan showing the vessel's scantlings. This plan must be made available to the Coast Guard marine inspector whenever the vessel undergoes a drydock examination, internal structural examination, underwater survey, or whenever repairs are made to the vessel's hull.

(c) Each barge that holds a Load Line Certificate must have a plan showing the barge's scantlings. The plan need not be maintained on board the barge but must be made available to the Coast Guard marine inspector whenever the barge undergoes a drydock examination, internal structural examination, underwater survey, or whenever repairs are made to the barge's hull.

[CGD 84-024, 52 FR 39655, Oct. 23, 1987; USCG-2000-6858, 67 FR 21083, Apr. 29, 2002]