Skip to content
LexBuild

46 CFR § 170.095 - Data submittal for a vessel equipped to lift.

---
identifier: "/us/cfr/t46/s170.095"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "46 CFR § 170.095 - Data submittal for a vessel equipped to lift."
title_number: 46
title_name: "Shipping"
section_number: "170.095"
section_name: "Data submittal for a vessel equipped to lift."
chapter_name: "COAST GUARD, DEPARTMENT OF HOMELAND SECURITY"
subchapter_number: "S"
subchapter_name: "SUBDIVISION AND STABILITY"
part_number: "170"
part_name: "STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "43 U.S.C. 1333; 46 U.S.C. 2103, 3306, 3703; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; Department of Homeland Security Delegation No. 0170.1."
regulatory_source: "CGD 79-023, 48 FR 51010, Nov. 4, 1983, unless otherwise noted."
cfr_part: "170"
---

# 170.095 Data submittal for a vessel equipped to lift.

The following data must be submitted with the plans required by § 170.075 if the vessel is engaged in lifting and is required to comply with subpart B of part 173 of this chapter:

(a) A graph of maximum hook load versus maximum crane radius.

(b) A table of crane radius versus the maximum distance above the main deck to which the hook load can be raised.

(c) A table showing maximum vertical and transverse moments at which the crane is to operate.