33 U.S.C. 1321(j); 46 U.S.C. 2103, 3205, 3306, 3307; 49 U.S.C. App. 1804; E.O. 11735, 38 FR 21243, 3 CFR, 1971-1975 Comp., p. 743; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; Department of Hom... 33 U.S.C. 1321(j); 46 U.S.C. 2103, 3205, 3306, 3307; 49 U.S.C. App. 1804; E.O. 11735, 38 FR 21243, 3 CFR, 1971-1975 Comp., p. 743; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; Department of Homeland Security Delegation No. 0170.1.
# 176.804 Machinery.At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including the following:(a) Operation of the main propulsion machinery both ahead and astern;(b) Operational test and inspection of engine control mechanisms including primary and alternate means of starting machinery;(c) Inspection of all machinery essential to the routine operation of the vessel including generators and cooling systems;(d) External inspection of fuel tanks and inspection of tank vents, piping, and pipe fittings;(e) Inspection of all fuel system;(f) Operational test of all valves in fuel lines by operating locally and at remote operating positions;(g) Operational test of all overboard discharge and intake valves and watertight bulkhead pipe penetration valves;(h) Operational test of the means provided for pumping bilges; and(i) Test of machinery alarms including bilge high level alarms.