Skip to content
LexBuild

Title 46, Part 52 — Power Boilers

37 sections

Section 52.01-1
Incorporation by reference.
Section 52.01-2
Adoption of Section I of the ASME BPVC.
Section 52.01-3
Definition of terms used in this part.
Section 52.01-5
Plans.
Section 52.01-10
Automatic controls.
Section 52.01-35
Auxiliary, donkey, fired thermal fluid heater, and heating boilers.
Section 52.01-40
Materials and workmanship.
Section 52.01-50
Fusible plugs (modifies A-19 through A-21).
Section 52.01-55
Maximum allowable working pressure.
Section 52.01-90
Materials.
Section 52.01-95
Design (modifies PG-16 through PG-31 and PG-100).
Section 52.01-100
Openings and compensation (modifies PG-32 through PG-39, PG-42 through PG-55).
Section 52.01-105
Piping, valves and fittings (modifies PG-58 and PG-159).
Section 52.01-110
Water-level indicators, water columns, gauge-glass connections, gauge cocks, and pressure gauges (modifies PG-60).
Section 52.01-115
Feedwater supply (modifies PG-61).
Section 52.01-120
Safety valve and safety relief valves (modifies PG-67 through PG-73).
Section 52.01-130
Installation.
Section 52.01-135
Inspection and tests (modifies PG-90 through PG-100).
Section 52.01-140
Certification by stamping (modifies PG-104 through PG-113).
Section 52.01-145
Manufacturer's data report forms (modifies PG-112 and PG-113).
Section 52.05-1
General (modifies PW-1 through PW-54).
Section 52.05-15
Heat treatment (modifies PW-10).
Section 52.05-20
Radiographic and ultrasonic examination (modifies PW-11 and PW-41.1).
Section 52.05-30
Minimum requirements for attachment welds (modifies PW-16).
Section 52.05-45
Circumferential joints in pipes, tubes, and headers (modifies PW-41).
Section 52.15-1
General (modifies PWT-1 through PWT-15).
Section 52.15-5
Tube connections (modifies PWT-9 and PWT-11).
Section 52.20-1
General (modifies PFT-1 through PFT-49).
Section 52.20-17
Opening between boiler and safety valve (modifies PFT-44).
Section 52.20-25
Setting (modifies PFT-46).
Section 52.25-1
General.
Section 52.25-3
Feedwater heaters (modifies PFH-1).
Section 52.25-5
Miniature boilers (modifies PMB-1 through PMB-21).
Section 52.25-7
Electric boilers (modifies PEB-1 through PEB-19).
Section 52.25-10
Organic fluid vaporizer generators (modifies PVG-1 through PVG-12).
Section 52.25-15
Fired thermal fluid heaters.
Section 52.25-20
Exhaust gas boilers.