Skip to content
LexBuild

48 CFR § 1515.404-473 - 1515.404-473 Limitations.

---
identifier: "/us/cfr/t48/s1515.404-473"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "48 CFR § 1515.404-473 - 1515.404-473   Limitations."
title_number: 48
title_name: "Federal Acquisition Regulations System"
section_number: "1515.404-473"
section_name: "1515.404-473   Limitations."
chapter_number: 15
chapter_name: "ENVIRONMENTAL PROTECTION AGENCY"
subchapter_number: "C"
subchapter_name: "CONTRACTING METHODS AND CONTRACT TYPES"
part_number: "1515"
part_name: "CONTRACTING BY NEGOTIATION"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "5 U.S.C. 301; Sec. 205(c), 63 Stat. 390, as amended, 40 U.S.C. 486(c); and 41 U.S.C. 418b."
regulatory_source: "64 FR 47410, Aug. 31, 1999, unless otherwise noted."
cfr_part: "1515"
---

# 1515.404-473 1515.404-473   Limitations.

(a) In addition to the limitations established by statute (see FAR 15.404-4(b)(4)(i)), no administrative ceilings on profits or fees shall be established, except those otherwise identified in the EPAAR.

(b) The contracting officer shall not consider any known subcontractor profit/fee as part of the basis for determining the contractor profit/fee.

[64 FR 47410, Aug. 31, 1999, as amended at 82 FR 33019, July 19, 2017]