48 CFR § 225.202 - 225.202 Exceptions.
---
identifier: "/us/cfr/t48/s225.202"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "48 CFR § 225.202 - 225.202 Exceptions."
title_number: 48
title_name: "Federal Acquisition Regulations System"
section_number: "225.202"
section_name: "225.202 Exceptions."
chapter_number: 2
chapter_name: "DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE"
subchapter_number: "D"
subchapter_name: "SOCIOECONOMIC PROGRAMS"
part_number: "225"
part_name: "FOREIGN ACQUISITION"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "41 U.S.C. 1303 and 48 CFR chapter 1."
regulatory_source: "56 FR 36367, July 31, 1991, unless otherwise noted."
cfr_part: "225"
---
# 225.202 225.202 Exceptions.
(a)(2) A nonavailability determination is not required for construction materials listed in FAR 25.104(a). For other materials, a nonavailability determination shall be approved at the levels specified in 225.103(b)(ii). Use the estimated value of the construction materials to determine the approval level. A nonavailability determination is not required before January 1, 2030, if there is an offer for foreign construction material that exceeds 55 percent domestic content (also see FAR 25.204(b)(1)(ii) and (b)(2)(ii)).
[89 FR 11954, Feb. 15, 2024]