Skip to content
LexBuild

48 CFR § 536.102 - 536.102 Definitions.

---
identifier: "/us/cfr/t48/s536.102"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "48 CFR § 536.102 - 536.102   Definitions."
title_number: 48
title_name: "Federal Acquisition Regulations System"
section_number: "536.102"
section_name: "536.102   Definitions."
chapter_number: 5
chapter_name: "GENERAL SERVICES ADMINISTRATION"
subchapter_number: "F"
subchapter_name: "SPECIAL CATEGORIES OF CONTRACTING"
part_number: "536"
part_name: "CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "40 U.S.C. 121(c)."
regulatory_source: "64 FR 37224, July 9, 1999, unless otherwise noted."
cfr_part: "536"
---

# 536.102 536.102   Definitions.

*Construction-Manager-as-Constructor (CMc)* means the project delivery method where design and construction are contracted concurrently through two separate contracts and two separate contractors. Unlike the traditional design-bid-build delivery method, under the CMc delivery method, the Government awards a separate contract to a designer (*i.e.,* architect-engineer contractor) and to a construction contractor (*i.e.,* CMc contractor) prior to the completion of the design documents. The Government retains the CMc contractor during design to work with the architect-engineer contractor to provide constructability reviews and cost estimating validation. The CMc contract includes design phase services at a firm-fixed-price and an option for construction at a guaranteed maximum price.

[84 FR 69632, Dec. 19, 2019]