Skip to content
LexBuild

49 CFR § 192.235 - Preparation for welding.

---
identifier: "/us/cfr/t49/s192.235"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "49 CFR § 192.235 - Preparation for welding."
title_number: 49
title_name: "Transportation"
section_number: "192.235"
section_name: "Preparation for welding."
chapter_name: "PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION"
subchapter_number: "D"
subchapter_name: "PIPELINE SAFETY"
part_number: "192"
part_name: "TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 185(w)(3), 49 U.S.C. 5103, 60101  and 49 CFR 1.97."
regulatory_source: "35 FR 13257, Aug. 19, 1970, unless otherwise noted."
cfr_part: "192"
---

# 192.235 Preparation for welding.

Before beginning any welding, the welding surfaces must be clean and free of any material that may be detrimental to the weld, and the pipe or component must be aligned to provide the most favorable condition for depositing the root bead. This alignment must be preserved while the root bead is being deposited.