Skip to content
LexBuild

49 CFR § 192.376 - Installation of plastic service lines by trenchless excavation.

---
identifier: "/us/cfr/t49/s192.376"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "49 CFR § 192.376 - Installation of plastic service lines by trenchless excavation."
title_number: 49
title_name: "Transportation"
section_number: "192.376"
section_name: "Installation of plastic service lines by trenchless excavation."
chapter_name: "PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION"
subchapter_number: "D"
subchapter_name: "PIPELINE SAFETY"
part_number: "192"
part_name: "TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 185(w)(3), 49 U.S.C. 5103, 60101  and 49 CFR 1.97."
regulatory_source: "35 FR 13257, Aug. 19, 1970, unless otherwise noted."
cfr_part: "192"
---

# 192.376 Installation of plastic service lines by trenchless excavation.

Plastic service lines installed by trenchless excavation must comply with the following:

(a) Each operator shall take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and structures at the time of installation.

(b) For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by § 192.3, to ensure the pipeline will not be damaged by any excessive forces during the pulling process.

[Amdt. 192-124, 83 FR 58719, Nov. 20, 2018]