Skip to content
LexBuild

49 CFR § 195.266 - Construction records.

---
identifier: "/us/cfr/t49/s195.266"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "49 CFR § 195.266 - Construction records."
title_number: 49
title_name: "Transportation"
section_number: "195.266"
section_name: "Construction records."
chapter_name: "PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION"
subchapter_number: "D"
subchapter_name: "PIPELINE SAFETY"
part_number: "195"
part_name: "TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 185(w)(3), 49 U.S.C. 5103, 60101  and 49 CFR 1.97."
regulatory_source: "Amdt. 195-22, 46 FR 38360, July 27, 1981, unless otherwise noted."
cfr_part: "195"
---

# 195.266 Construction records.

A complete record that shows the following must be maintained by the operator involved for the life of each pipeline facility:

(a) The total number of girth welds and the number nondestructively tested, including the number rejected and the disposition of each rejected weld.

(b) The amount, location; and cover of each size of pipe installed.

(c) The location of each crossing of another pipeline.

(d) The location of each buried utility crossing.

(e) The location of each overhead crossing.

(f) The location of each valve and corrosion test station.

[Amdt. 195-22, 46 FR 38360, July 27, 1981, as amended by Amdt. 195-34, 50 FR 34474, Aug. 26, 1985]