Skip to content
LexBuild

49 CFR § 236.589 - Relays.

---
identifier: "/us/cfr/t49/s236.589"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "49 CFR § 236.589 - Relays."
title_number: 49
title_name: "Transportation"
section_number: "236.589"
section_name: "Relays."
chapter_name: "FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION"
part_number: "236"
part_name: "RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "49 U.S.C. 20102-20103, 20107, 20133, 20141, 20157, 20301-20303, 20306, 20501-20505, 20701-20703, 21301-21302, 21304; 28 U.S.C. 2461 note; and 49 CFR 1.89."
regulatory_source: "33 FR 19684, Dec. 25, 1968, unless otherwise noted."
cfr_part: "236"
---

# 236.589 Relays.

(a) Each relay shall be removed from service, subjected to thorough test, necessary repairs and adjustments made, and shall not be replaced in service unless its operating characteristics are in accordance with the limits within which such relay is designed to operate, as follows:

(1) Master or primary relays of torque type depending on spring tension to return contacts to deenergized position in noncoded continuous inductive automatic train stop or train control system, at least once every two years; and

(2) All other relays, at least once every six years.

(b) [Reserved]

[49 FR 3387, Jan. 26, 1984]