49 CFR § 271.103 - Risk-based hazard management program.

---
identifier: "/us/cfr/t49/s271.103"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "49 CFR § 271.103 - Risk-based hazard management program."
title_number: 49
title_name: "Transportation"
section_number: "271.103"
section_name: "Risk-based hazard management program."
chapter_name: "FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION"
part_number: "271"
part_name: "RISK REDUCTION PROGRAM"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "49 U.S.C. 20103, 20106-20107, 20118-20119, 20156, 21301, 21304, 21311; 28 U.S.C. 2461 note; and 49 CFR 1.89."
regulatory_source: "85 FR 9314, Feb. 18, 2020, unless otherwise noted."
cfr_part: "271"
---

# 271.103 Risk-based hazard management program.

(a) *General.* (1) An RRP shall include an integrated, system-wide, and ongoing risk-based HMP that proactively identifies hazards and mitigates the risks resulting from those hazards.

(2) A risk-based HMP shall be fully implemented (*i.e.,* activities initiated) within 36 months after FRA approves a railroad's RRP plan pursuant to § 271.301(d).

(b) *Risk-based hazard analysis.* As part of its risk-based HMP, a railroad shall conduct a risk-based hazard analysis that addresses, at a minimum, the following aspects of a railroad's system: Infrastructure; equipment; employee levels and work schedules; operating rules and practices; management structure; employee training; and other areas impacting railroad safety that are not covered by railroad safety laws or regulations or other Federal laws or regulations. A railroad shall make the results of its risk-based hazard analysis available to FRA upon request. At a minimum, a risk-based hazard analysis shall:

(1) Identify hazards by analyzing:

(i) Aspects of the railroad's system, including any operational changes, system extensions, or system modifications; and

(ii) Accidents/incidents, injuries, fatalities, and other known indicators of hazards;

(2) Calculate risk by determining and analyzing the likelihood and severity of potential events associated with identified risk-based hazards; and

(3) Compare and prioritize the identified risks for mitigation purposes.

(c) *Mitigation strategies.* (1) As part of its risk-based HMP, a railroad shall design and implement mitigation strategies that improve safety by:

(i) Mitigating or eliminating aspects of a railroad's system that increase risks identified in the risk-based hazard analysis; and

(ii) Enhancing aspects of a railroad's system that decrease risks identified in the risk-based hazard analysis.

(2) A railroad may use pilot projects, including pilot projects conducted by other railroads, to determine whether quantitative data suggests that a particular mitigation strategy has potential to succeed on a full-scale basis.