Skip to content
LexBuild

49 CFR § 551.60 - When must the Designation by Foreign Manufacturer be signed?

---
identifier: "/us/cfr/t49/s551.60"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "49 CFR § 551.60 - When must the Designation by Foreign Manufacturer be signed?"
title_number: 49
title_name: "Transportation"
section_number: "551.60"
section_name: "When must the Designation by Foreign Manufacturer be signed?"
chapter_name: "NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION"
part_number: "551"
part_name: "PROCEDURAL RULES"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "Secs. 110(e), 119, 80 Stat. 719, 728 (15 U.S.C. 1399, 1407); 23 U.S.C. 315, 401-404; delegation of authority, 31 FR 13952, 32 FR 5606."
regulatory_source: "33 FR 19700, Dec. 25, 1968, unless otherwise noted. Redesignated at 35 FR 5118, Mar. 26, 1970."
cfr_part: "551"
---

# 551.60 When must the Designation by Foreign Manufacturer be signed?

(a) The foreign manufacturer must sign the Designation by Foreign Manufacturer on or before the date that the agent signs the Acceptance by Agent. It is not possible for an individual or entity to accept a designation as agent until on or after the date on which a foreign manufacturer makes the designation.

(b) If the Designation by Foreign Manufacturer is dated after the Acceptance by Agent, NHTSA will deem the designation insufficient under this subpart and reject the submission.