Skip to content
LexBuild

50 CFR § 29.97 - What additional information must be included if I am proposing production operations?

---
identifier: "/us/cfr/t50/s29.97"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "50 CFR § 29.97 - What additional information must be included if I am proposing production operations?"
title_number: 50
title_name: "Wildlife and Fisheries"
section_number: "29.97"
section_name: "What additional information must be included if I am proposing production operations?"
chapter_name: "UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR"
subchapter_number: "C"
subchapter_name: "THE NATIONAL WILDLIFE REFUGE SYSTEM"
part_number: "29"
part_name: "LAND USE MANAGEMENT"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "5 U.S.C. 301; 16 U.S.C. 460k, 664, 668dd, 685, 690d, 715i, 725, 3161; 30 U.S.C. 185; 31 U.S.C. 3711, 9701; 40 U.S.C. 319; 43 U.S.C. 315a; 113 Stat. 1501A-140."
regulatory_source: "31 FR 16026, Dec. 15, 1966, unless otherwise noted."
cfr_part: "29"
---

# 29.97 What additional information must be included if I am proposing production operations?

If you are proposing to produce a well, you must submit the information requested on FWS Form 3-2469, including, but not limited to:

(a) The dimensions and the to-scale layout of the well pad, clearly identifying well locations, noting partial reclamation areas; gathering, separation, metering, and storage equipment; electrical lines; fences; spill control equipment or structures, including lined areas, artificial lift equipment, tank batteries, treating and separating vessels, secondary or enhanced recovery facilities, water disposal facilities, gas compression and/or injection facilities; metering points; sales point (if on lease); tanker pickup points; gas compressor, including size and type (if applicable); and any other well site equipment.

(b) A general description of anticipated stimulations, servicing, and workovers.

(c) A description of the procedures and equipment used to maintain well control.

(d) A description of the method and means used to transport produced oil and gas, including vehicular transport; flowline and gathering line construction and operation, pipe size, and operating pressure; cathodic protection methods; surface equipment use; surface equipment location; maintenance procedures; maintenance schedules; pressure detection methods; and shutdown procedures.

(e) A road and well pad maintenance plan, including equipment and materials to maintain the road surface and control erosion.

(f) A vegetation management plan on well sites, roads, pipeline corridors, and other disturbed surface areas, including control of noxious and invasive species.

(g) A stormwater management plan on the well site.

(h) A produced water storage and disposal plan.

(i) A description of the equipment, materials, and procedures proposed for well plugging.