Skip to content
LexBuild

Environmental Impact Statements; Notice of Availability

---
identifier: "/us/fr/04-20508"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Environmental Impact Statements; Notice of Availability"
title_number: 0
title_name: "Federal Register"
section_number: "04-20508"
section_name: "Environmental Impact Statements; Notice of Availability"
positive_law: false
currency: "2004-09-10"
last_updated: "2004-09-10"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Environmental Protection Agency"
document_number: "04-20508"
document_type: "notice"
publication_date: "2004-09-10"
agencies:
  - "Environmental Protection Agency"
fr_citation: "69 FR 54778"
fr_volume: 69
docket_ids:
  - "ER-FRL-6655-5"
---

#  Environmental Impact Statements; Notice of Availability

*Responsible Agency:* Office of Federal Activities, General Information (202) 564-7167 or *http://www.epa.gov/compliance/nepa/.*

Weekly receipt of Environmental Impact Statements filed August 30, 2004 through September 3, 2004 Pursuant to 40 CFR 1506.9.

*EIS No. 040415, FINAL EIS, COE, AK,* Akutan Harbor Navigation Improvements Project, Construction and Implementation, Bering Sea, City of City of Akutan, AK. *Wait Period Ends:* October 12, 2004. *Contact:* Wayne M. Crayton (907) 753-2672.

*EIS No. 040416, FINAL EIS, NPS, CA,* Point Reyes National Seashore (PRNS) and the North District of Golden Gate National Recreation Area (GGNRA) Fire Management Plan, Implementation, Marin County, CA. *Wait Period Ends:* October 12, 2004.

*Contact:* Roger Wong (415) 464-5100.

*EIS No. 040417, FINAL EIS, FHW, MO,* U.S. 40/61 Bridge Location Study Over the Missouri River, Improvement of the Transportation System, Section 9 of the Rivers and Harbor Act Permit, and U.S. Army COE Section 10 and 404 Permits, Missouri River, St. Charles and St. Louis Counties, MO. *Wait Period Ends:* October 12, 2004. *Contact:* Donald Neumann (573) 636-7104.

*EIS No. 040418, FINAL EIS, COE, FL,* Programmatic EIS—Florida Keys Water Quality Improvements Program, To Implement Wastewater and Stormwater Improvements, South Florida Water Management District, Monroe County, FL. *Wait Period Ends:* October 12, 2004. *Contact:* Dennis Barnett (404) 562-5225.

*EIS No. 040419, DRAFT SUPPLEMENT, GSA, TX,* Del Rio Port of Entry (POE), Increased Security Measures Associated with Phase II Expansion, Supplement to the 1992 Del Rio Border Patrol Station, Del Rio, Val Verde County, TX. *Comment Period Ends:* October 25, 2004. *Contact:* Rae Lynn Schneider (972) 423-5480.

*EIS No. 040420, FINAL EIS, COE, FL,* Miami Harbor Navigation Improvements Project to Study the Feasibility of Widening and Deepening Portions of the Port, Miami-Dade County, FL. *Wait Period Ends:* October 12, 2004. *Contact:* Ms. Term Jordan (904) 232-2117.

*EIS No. 040421, FINAL EIS, NPS, MD, VA, PA, DC,* Chesapeake Bay Special Resource Study (NRS), To Conserve and Restore Chesapeake Bay, New Unit of the National Park System, MD, VA, PA and DC. *Wait Period Ends:* October 12, 2004. *Contact:* Jonathan Diehard (410) 267-5725.

*This document is available on the Internet at:**http://www.chesapeakestudy.org.*

*EIS No. 040422, DRAFT EIS, AFS, NM,* San Diego Range Allotment Project, Proposes to Revise Grazing Program, Santa Fe National Forest, Jerez Ranger District, Township 17-19 North, Range 1-3 East, Sandoval County, NM. *Comment Period Ends:* October 25, 2004. *Contact:* Rita Skinner (505) 829-3535.

*EIS No. 040423, FINAL EIS, AFS, CA,* Meteor Project, Proposal for Harvesting Timber and Conducting Associated Activities on 744 Acres, Implementation, Klamath National Forest, Salmon River Ranger District, Siskiyou County, CA. *Wait Period Ends:* October 12, 2004. *Contact:* Margaret J. Boland (530) 841-4501.

*EIS No. 040424, DRAFT EIS, FRA, CA,* Los Angeles Union Station Run-Through Tracks Project, To Improve Pedestrain Access, Connectivity and Increase the Capacity, City Los Angeles, Los Angeles County, CA. *Comment Period Ends:* October 25, 2004. *Contact:* David Valenstein (202) 493-6368.

*EIS No. 040425, DRAFT EIS, FHW, UT,* U.S. 6 Highway Project, Improvements from Interstate 15 (I-15) in Spanish Fork to Instate 70 (I-70) near Green River, Funding, Right-of-Way Permit and U.S. Army COE Section 404 Permit, Utah, Wasatch, Carbon and Emery Counties, UT. *Comment Period Ends:* October 29, 2004. *Contact:* Jeff Berna (801) 963-0182.

*EIS No. 040426, DRAFT EIS, NRC, AR,* Generic—License Renewal of Nuclear Plants, Arkansas Nuclear One, Unit 2 (Tac. Nos. MB 8405) Supplement 19 to NUREG-1437, Operating License Renewal, Pope County, AR. * Comment  Period Ends: * November 24, 2004. *Contact:* Thomas Kenyon (301) 415-1120.

*EIS No. 040427, DRAFT EIS, BLM, NV,* Las Vegas Valley Disposal Boundary Project, Disposal and Use of Public Land under the Management of (BLM), Implementation, Clark County, NV. *Comment Period Ends:* November 9, 2004. *Contact:* Jeff Steinmetz (702) 515-5097.

*EIS No. 040428, DRAFT EIS, BLM,* Programmatic—Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States. *Comment Period Ends:* December 9, 2004. *Contact:* Lee Otteni (505) 599-8911.

*EIS No. 040429, FINAL EIS, NOA, FL,* Programmatic EIS—Seagrass Restoration in the Florida Keys National Marine Sanctuary, Implementation, U.S. Army COE Section 404 and CZMA Permits, Monroe County, FL. *Wait Period Ends:* October 12, 2004. *Contact:* Harriet Sopher (301) 713-3125.

*EIS No. 040430, FINAL EIS, AFS, WY,* Wyoming Range Allotment Complex, To Determine Whether or not to Allow Domestic Sheep Grazing, Bridger-Teton National Forest, Big Piney, Greys River and Jackson Ranger Districts, Sublette, Lincoln and Teton Counties, WY. *Wait Period Ends:* October 12, 2004. *Contact:* Greg Clark (307) 276-3375.

**Amended Notices**

*EIS No. 040261, DRAFT EIS, BLM, CO, Nor* thern San Juan Basin Coal Bed Methane Project, Proposed to Drill Approximately 300 Well to Produce Natural Gas from Coal Beds on Federal, State and Private Owned Lands, Special-Use-Permit, Application for Permit to Drill and U.S. Army COE Section 404 Permit, LaPlata and Archulea Counties, CO. *Comment Period Ends:* November 30, 2004. *Contact:* Walt Brown (970) 385-1372. Revision of FR Notice published on 6/11/04: CEQ comment period ending 9/13/2004 has been extended to 11/30/2004.

Dated: September 7, 2004.

Robert W. Hargrove,

Division Director, NEPA Compliance Division, Office of Federal Activities.