# Environmental Impact Statements; Notice of Availability
*Responsible Agency:* Office of Federal Activities, General Information (202) 564-7167 or *http://www.epa.gov/compliance/nepa/.*
Weekly receipt of Environmental Impact Statements
Filed October 18, 2004 Through October 22, 2004
Pursuant to 40 CFR 1506.9.
*EIS No. 040495, FINAL EIS, AFS, MT,* Fortine Project, To Implement Vegetation Management, Timber Harvest and Fuel Reduction Activities, Kootenai National Forest, Fortine Ranger District, Lincoln County, MT, *Wait Period Ends:* November 29, 2004, *Contact:* Joleen Dunham (406) 882-4451.
*EIS No. 040496, DRAFT SUPPLEMENT, FHW, NC,* Eastern Section of the Winston-Salem Northern Beltway, U.S. 52 south to I-40 Business and I-40 Business south to U.S. 311, Improvements to the Surface Transportation Network, TIP Project Nos. U-2579 and U-2579A, Forsyth County, NC, *Comment Period Ends:* January 5, 2005, *Contact:* John F. Sullivan, III, P.E. (919) 856-4346.
*EIS No. 040497, FINAL SUPPLEMENT, FHW, NC,* Western Section of the Winston-Salem Northern Beltway, U.S. 158 north to U.S. 52, TIP Nos. R-2247, Forsyth County, NC, *Wait Period Ends:* November 29, 2004, *Contact:* John F. Sullivan, III, P. (919) 856-4346.
*EIS No. 040498, FINAL EIS, AFS, UT,* Wasatch Powerbird Guides Permit Renewal, Authorization to Continue Providing Guided Helicopter Skiing Activities on National Forest System (NFS) Land on the Wasatch-Cache and Uinta National Forests, Special-Use Permit (SUP), Provo and Salt Lake City, UT, *Wait Period Ends:* November 29, 2004, *Contact:* Steve Scheid (801) 733-2689. This document is available on the Internet at: *http://www.fs.fed.us/r4/wcnf/projects/decision/wpg.*
*EIS No. 040499, FINAL EIS, COE, AK,* Unalaska Navigation Improvements Project, Construction of Harbor on Amaknak Island in Aleutian Island Chain, Locally known as “Little South America, Integrated Feasibility Report, Aleutian Island, AK, *Wait Period Ends:* November 29, 2004, Contact: Guy McConnell (907) 753-2614.
*EIS No. 040500, DRAFT EIS, FHW, UT,* Brown Park Road Project, Reconstruction (Paving) and Partial Re-alignment from Red Creek to Colorado State Line, Diamond Mountain Resource Management Plan Amendment (BLM), U.S. Army COE Section 404 Permit, Daggett County, UT, *Comment Period Ends:* December 17, 2004, *Contact:* Gregory S. Punske, P.E. (801) 963-0182.
*EIS No. 040501, FINAL EIS, COE, CA,* Hamilton City Flood Damage Reduction and Ecosystem Restoration, Propose to Increase Flood Protection and Restore the Ecosystem, Sacramento River, Glenn County, CA *Wait Period Ends:* November 29, 2004, *Contact:* Alicia Kirchner (916) 557-6767.
*EIS No. 040502, FINAL EIS, FHW, CT, CT-2/2A/32,* Transportation Improvement Study, Construction, Funding, Coast Guard Bridge Permit, NPDES Permit, COE Section 10 and 404 Permit, New London County, CT, *Wait Period Ends:* November 29, 2004, *Contact:* Bradley Keazer (860) 659-6703.
*EIS No. 040503, FINAL EIS, COE, CA,* Matilija Dam Ecosystem Restoration Feasibility Study, Restoring Anadromous Fish Populations, Matilija Creek, Ventura River, Ventura County Watershed Protection District, Ventura County, CA, *Wait Period Ends:* November 29, 2004, *Contact:* Chris Serjack (213) 452-3865.
Dated: October 26, 2004.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.