Skip to content
LexBuild

Sunshine Act Meeting; Notice

---
identifier: "/us/fr/E7-4595"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Sunshine Act Meeting; Notice"
title_number: 0
title_name: "Federal Register"
section_number: "E7-4595"
section_name: "Sunshine Act Meeting; Notice"
positive_law: false
currency: "2007-03-14"
last_updated: "2007-03-14"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Energy Department"
document_number: "E7-4595"
document_type: "notice"
publication_date: "2007-03-14"
agencies:
  - "Energy Department"
  - "Federal Energy Regulatory Commission"
fr_citation: "72 FR 11861"
fr_volume: 72
---

#  Sunshine Act Meeting; Notice

The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C 552b:

*Agency Holding Meeting:* Federal Energy Regulatory Commission.

*Date And Time:* March 15, 2007, 10 a.m.

*Place:* Room 2C, 888 First Street, NE., Washington, DC 20426.

*Status:* Open.

*Matters To Be Considered:* Agenda.

**Note:**

Items listed on the agenda may be deleted without further notice.

*Contact Person For More Information:* Philis J. Posey, Acting Secretary, Telephone (202) 502-8400.

For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.

This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at *http://www.ferc.gov* using the eLibrary link, or may be examined in the Commission's Public Reference Room.

| Item No. | Docket No. | Company |
| --- | --- | --- |
|  |  |  |
| A-1 | AD02-1-000 | Agency Administrative Matters. |
| A-2 | AD02-7-000 | Customer Matters, Reliability, Security and Market Operations. |
| A-3 | AD06-3-000 | Energy Market Update. |
|  |  |  |
| E-1 | ER04-691-079 | Midwest Independent Transmission System Operator, Inc. |
| E-2 | ER06-18-004 | Midwest Independent Transmission System Operator, Inc. |
| E-3 | ER06-18-006 | Midwest Independent Transmission System Operator, Inc. |
| E-4 | ER04-691-078 | Midwest Independent Transmission System Operator, Inc. |
| E-5 | EL06-87-000 | Cottonwood Energy Company, LP. |
| E-6 | TX07-1-000 | Brazos Electric Power Cooperative, Inc. |
| E-7 | ER05-115-001 | Duke Energy Oakland, LLC. |
| E-8 | ER06-185-003 | New York Independent System Operator, Inc. |
| E-9 | OMITTED |  |
| E-10 | TX06-3-000 | City of Tacoma, Washington and City of Seattle, Washington v. South Columbia Basin Irrigation District East Columbia Basin Irrigation District Quincy Columbia Basin Irrigation District Grand Coulee Project Hydroelectric Authority. |
|  | P-2849-015 | South Columbia Basin Irrigation District, East. |
|  | P-3295-012 | Columbia Basin Irrigation District, Quincy Columbia Basin Irrigation District and Grand Coulee Project Hydroelectric Authority. |
|  | DI07-3-000 | City of Tacoma, Washington and City of Seattle, Washington. |
| E-11 | OMITTED |  |
| E-12 | RM07-11-000 | Applicability of Federal Power Act Section 215 to Qualifying Small Power Production and Cogeneration Facilities. |
| E-13 | RM06-16-000 | Mandatory Reliability Standards for the Bulk-Power System. |
| E-14 | EL07-18-000 | New York Independent System Operator, Inc. v. Astoria Energy LLC. |
| E-15 | RM00-7-012 | Revision to Annual Charges to Public Utilities (Westar Energy, Inc. and Kansas Gas & Electric Company). |
| E-16 | TX06-2-000 | Aero Energy, LLC. |
| E-17 | ER05-522-001 | Bluegrass Generation Company, L.L.C. |
| E-18 | EL05-150-001 | Richard Blumenthal, Attorney General for the State of Connecticut, the Connecticut Office of Consumer Counsel, the Connecticut Municipal Electric Energy Cooperative and the Connecticut Industrial Energy Consumers v. ISO New England, Inc. |
| E-19 | ER06-1382-001 | Bluegrass Generation Company, L.L.C. |
|  |  |  |
| G-1 | RP06-231-002 | Norstar Operating, LLC v. Columbia Gas Transmission Corporation. |
|  | RP06-365-000 | Columbia Gas Transmission Corporation. |
| G-2 | PR07-1-000 | Peoples Gas Light and Coke Company. |
| G-3 | RP01-503-006 | Natural Gas Pipeline Company of America. |
| G-4 | OMITTED |  |
| G-5 | RP07-172-000 | Columbia Gulf Transmission Company. |
|  |  |  |
| H-1 | P-2216-066 | New York Power Authority. |
| H-2 | P-2438-062 | Seneca Falls Power Corporation. |
|  | P-11120-035 | Commonwealth Power Company. |
|  | P-11150-023 | Cameron Gas and Electric Company. |
|  | P-2239-039 | Tomahawk Power and Pulp Company. |
| H-3 | P-2539-031 | Erie Boulevard Hydropower, L.P. |
|  |  |  |
| C-1 | OMITTED |  |
| C-2 | CP05-383-000 | Algonquin Gas Transmission, LLC. |
| C-3 | CP07-75-000 | Sonora Pipeline, LLC. |
| C-4 | CP06-488-000 | Natural Gas Pipeline Company of America. |
|  | CP06-499-000 | Kinder Morgan Louisiana Pipeline LLC. |
| C-5 | OMITTED |  |
| C-6 | CP05-150-002 | Hardy Storage Company, LLC. |

Philis J. Posey,

Acting Secretary.

A free webcast of this event is available through *http://www.ferc.gov.* Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit *http://www.CapitolConnection.org* or contact Danelle Perkowski or David Reininger at 703-993-3100.

Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.