Skip to content
LexBuild

Preclosure Safety Analysis-Level of Information and Reliability Estimation; Availability of Final Interim Staff Guidance Document

---
identifier: "/us/fr/E7-7373"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Preclosure Safety Analysis-Level of Information and Reliability Estimation; Availability of Final Interim Staff Guidance Document"
title_number: 0
title_name: "Federal Register"
section_number: "E7-7373"
section_name: "Preclosure Safety Analysis-Level of Information and Reliability Estimation; Availability of Final Interim Staff Guidance Document"
positive_law: false
currency: "2007-04-18"
last_updated: "2007-04-18"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Nuclear Regulatory Commission"
document_number: "E7-7373"
document_type: "notice"
publication_date: "2007-04-18"
agencies:
  - "Nuclear Regulatory Commission"
fr_citation: "72 FR 19553"
fr_volume: 72
fr_action: "Notice of issuance; correction."
---

#  Preclosure Safety Analysis—Level of Information and Reliability Estimation; Availability of Final Interim Staff Guidance Document

**AGENCY:**

Nuclear Regulatory Commission.

**ACTION:**

Notice of issuance; correction.

**SUMMARY:**

This document corrects a notice, appearing in the *Federal Register* on March 22, 2007 (72 FR 13534), that announces the availability of a final interim staff guidance document on “Preclosure Safety  Analysis—Level of Information and Reliability Estimation.” This action is necessary to correct typographical errors.

**FOR FURTHER INFORMATION, CONTACT:**

Jon Chen, Project Manager, Division of High-Level Waste Repository Safety, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 [Telephone: (301) 415-5526; fax number: (301) 415-5399; e-mail: *[email protected].* ]

**SUPPLEMENTARY INFORMATION:**

On page 13534, in the middle column, in the first paragraph, last sentence, “waste at a geologic repository” is changed to “waste geologic repository.”

On page 13536, in the middle column, in the fourth complete paragraph, lines 4-5, “DOE should to consider” is changed to read “DOE should consider.”

On page 13536, in the middle column, in the fourth complete paragraph, lines 7-8, “DOE should to provide” is changed to read “DOE should provide.”

On page 13537, in the third column, in the eighth complete paragraph, lines 1-2, “Lines 445: Though 453: λ was changed to, to distinguish this quantity” is changed to “Lines 445 through 453: λ was changed to p  to distinguish this quantity.”

For the Nuclear Regulatory Commission.

Dated at Rockville, Maryland, this 11th day of April, 2007.

N. King Stablein,

Chief Project-Management Branch B, Division of High-Level Repository Safety, Office of Nuclear Material Safety and Safeguards.