# Environmental Impacts Statements; Notice of Availability
*Responsible Agency:* Office of Federal Activities, General Information (202) 564-7167 or *http://www.epa.gov/compliance/nepa/.*
Weekly receipt of Environmental Impact Statements
Filed 07/02/2007 through 07/06/2007
Pursuant to 40 CFR 1506.9.
*EIS No. 20070281, Draft EIS, AFS, WV,* Lower Williams Project Area (LWPA), Proposed to Perform Vegetation Management and Wildlife Habitat Improvements, Implementation, Gauley Ranger District, Monongahela National Forest, Webster County, WV, Comment Period Ends: 08/27/2007, Contact: O'Dell Tucker 304-799-4334 Ext 19.
*EIS No. 20070282, Draft EIS, AFS, 00,* Sierra Nevada Forests Management Indicator Species Amendment (MIS), Proposes to Adopt a Common List of Management Indicator Species (MIS), and Amending Land & Resource Management Plans for Following Ten Forests: Eldorado, Inyo, Lassen, Modoc, Plumas, Sequoia, Sierra, Stanislaus and Tahoe National Forests and Lake Tahoe Basin Management Unit, Several Counties, CA and Douglas, Esmeralda, Mineral Counties, NV, Comment Period Ends: 08/27/2007, Contact: Diana Craig 707-562-8737.
*EIS No. 20070283, Final EIS, AFS, OR,* Five Buttes Project, Conduct Vegetation Management Activities, Implementation, Deschutes National Forest, Crescent Ranger District, Deschutes County, OR, Wait Period Ends: 08/13/2007, Contact: Marcy Boehme 541-433-3200.
*EIS No. 20070284, Draft Supplement, DOE, CA,* Sacramento Area Voltage Support Project, Updated Information, Proposal to Build a Double-Circuit 230-kV Transmission Line, Placer, Sacramento and Sutter Counties, CA, Comment Period Ends: 08/27/2007, Contact: Catherine Cunningham 720-962-7000.
*EIS No. 20070285, Draft EIS, COE, CA,* Berth 136-147 [TraPac] Container Terminal Project, Upgrade Existing Wharf Facilities, Install a Buffer Area between the Terminal and Community, U.S. Army COE Section 10 and 404 Permit, West Basin Portion of the Port of Los Angeles, CA, Comment Period Ends: 08/27/2007, Contact: Dr. Spence D. MacNeil 805-585-2152.
*EIS No. 20070286, Draft EIS, BLM, WY,* Kemmerer Field Office Planning Area, Resource Management Plan, Implementation, Lincoln, Sweetwater and Uinta Counties, WY, Comment Period Ends: 10/11/2007 Contact: Michele Easley 307-828-4524.
*EIS No. 20070287, Final EIS, USA, MD,* Garrison Aberdeen Proving Ground, Base Realignment and Closure Actions, Realignment of Assets and Staff, Implementation, Harford and Baltimore Counties, MD, Wait Period Ends: 08/13/2007, Contact: Bob Ross 703-602-2878.
*EIS No. 20070288, Second Draft Supplement, NOA, 00,* Bottomfish and Seamount Groundfish Fisheries of the Western Pacific Region, Amendment 14 to the fishery Management Plan, Additional Information to Analyze a Range of Management Alternatives to End Bottomfish Overfishing in the Hawaiian Archipelago, HI, GU and AS, Comment Period Ends: 08/27/2007, Contact: William L. Robinson 808-973-2941.
*EIS No. 20070289, Draft EIS, SFW, AZ,* Horseshoe and Bartlett Reservoirs Project, To Store and Release Water, Issuance of an Incidental Take Permit for Operation, Located Northeast of Phoenix, Maricopa and Yavapai Counties, AZ, Comment Period Ends: 09/18/2007, Contact: Debra Bills 602-242-0210.
*EIS No. 20070290, Final EIS, RUS, MO,* Norborne Baseload Power Plant, Proposed Construction and Operation of a 660-megawatt Net Coal-Fired Power Plant, Carroll County, MO, Wait Period Ends: 08/13/2007, Contact: Stephanie Strength 202-720-0468.
*EIS No. 20070291, Draft EIS, APH, 00,* PROGRAMMATIC—Introduction of Genetically Engineered (GE) Organisms, To Address Current and Future Technological Trends Resulting GE Plants, Implementation, Comment Period Ends: 08/27/2007, Contact: Michael J. Wach 301-734-0485.
*EIS No. 20070292, Final EIS, COE, CA,* San Luis Rey Flood Control Project, Operation and Maintenance of the Vegetation and Sediment Management, from College Blvd to the Pacific Ocean, San Diego County, CA, Wait Period Ends: 08/13/2007, Contact: Tiffany Kayama 213-452-3845.
*EIS No. 20070293, Final EIS, SFW, 00,* Light Goose Management Plan, Reducing and Stabilitizing Specific Populations “Light Geese” in North America, Implementation, Wait Period Ends: 08/13/2007, Contact: James R. Kelley 612-713-5409.
*EIS No. 20070294, Final EIS, APH, 00,* ADOPTION—Resident Canada Goose Management Plan, Evaluate Alternatives Strategies to Reduce, Manage, and Resident Canada Goose Population, Implementation, within the Conteriminous U.S., Contact: David Reinhold 301-734-7921.
U.S. DOA, APH has adopted the U.S. DOI/SFW Final EIS 20050479 filed 11/09/2005. APH was a cooperating agency on the project. Recirculation of the document is not necessary under 1506.3(b) of the CEQ Regulations.
**Amended Notices**
*EIS No. 20070119, Draft EIS, NOA, AK,* PROGRAMMATIC—Outer Continental Shelf Seismic Surveys in the Beaufort and Chukchi Seas, Proposed Offshore Oil and Gas Seismic Survey, AK, Comment Period Ends: 07/30/2007, Contact: William T. Hogarth 301-713-1632.
Revision of FR Notice Published 05/18/2007; Review Period extended to 07/30/2007.
*EIS No. 20070185, Draft EIS, FHW, GA,* Northwest I-75/I-575 Corridor Project, Transportation Improvements, Funding, Cobb and Cherokee Counties, GA, Comment Period Ends: 08/13/2007, Contact: Wayne Fedora 404-562-3651.
Revision of FR Notice Published on 05/18/2007; Review Period extended to 08/13/2007.
Dated: July 10, 2007.
Robert W. Hargrove,