Skip to content
LexBuild

Environmental Impacts Statements; Notice of Availability

---
identifier: "/us/fr/E7-24839"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Environmental Impacts Statements; Notice of Availability"
title_number: 0
title_name: "Federal Register"
section_number: "E7-24839"
section_name: "Environmental Impacts Statements; Notice of Availability"
positive_law: false
currency: "2007-12-21"
last_updated: "2007-12-21"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Environmental Protection Agency"
document_number: "E7-24839"
document_type: "notice"
publication_date: "2007-12-21"
agencies:
  - "Environmental Protection Agency"
fr_citation: "72 FR 72707"
fr_volume: 72
docket_ids:
  - "ER-FRL-6694-2"
---

#  Environmental Impacts Statements; Notice of Availability

*Responsible Agency:* Office of Federal Activities, General Information (202) 564-7167 or *http://www.epa.gov/compliance/nepa/* .

Weekly receipt of Environmental Impact Statements

Filed 12/10/2007 Through 12/14/2007

Pursuant to 40 CFR 1506.9.

*EIS No. 20070522, Final EIS, IBR, CA* , Lower Yuba River Accord, Proposal to Resolve Instream Flow Issues Associated with Operation, Yuba River, Yuba County, CA, *Wait Period Ends:* 01/22/2008, *Contact:* Tim Rust 916-978-5516

*EIS No. 20070523, Draft EIS, NRC, NC* , Generic—License Renewal of Nuclear Plants (GEIS) Regarding Shearon Harris Nuclear Power Plant, Unit 1, Plant-Specific Supplement 33 to NUREG-1437, Wake County, NC, *Comment Period Ends:* 03/05/2008, *Contact:* Samuel Hernandez 301-415-4049.

*EIS No. 20070524, Draft EIS, BLM, 00* , PROGRAMMATIC EIS—Oil Shale and Tar Sands Resource Management (RMP) Amendments to Address Land Use Allocations in Colorado, Utah and Wyoming, *Comment Period Ends:* 03/20/2008, *Contact:* Michael Nedd 202-208-4201.

*EIS No. 20070525, Final EIS, NPS, CA* , Big Lagoon Wetland and Creek Restoration Project, To Restore a Functional, Self-Sustaining Ecosystem, including Wetland, Riparian, and Aquatic Components, Golden Gate National Area, Muir Beach, Marin County, CA, *Wait Period Ends:* 02/04/2008, *Contact:* Steve Ortega 415-561-4841.

*EIS No. 20070526, Draft EIS, AFS, WY* , Thunder Basin National Grassland Prairie Dog Management Strategy, Land and Resource Management Plan Amendment #3, Proposes to Implement a Site-Specific Strategy to Manage Black Trailed Prairie Dog, Douglas Ranger District, Medicine Bow-Routt National Forests and Thunder Basin National Grassland, Campbell, Converse, Niobrara and Weston Counties, WY, *Comment Period Ends:* 02/04/2008, *Contact:* Misty Hays 307-358-4690.

*EIS No. 20070527, Draft EIS, JUS, NV* , Las Vegas Detention Facility, Proposed Contractor-Owned/Contractor-Operated Detention Facility, Implementation, Nevada Area, *Comment Period Ends:* 02/04/2008, *Contact:* Scott P. Stermer 202-353-4601.

*EIS No. 20070528, Final EIS, AFS, UT* , Millville Peak/Logan Peak Road Relocation Project, Provide a Safe, Reliable, Ground Access Route, Logan Ranger District, Wasatch-Cache National Forest, Cache County, UT, *Wait Period Ends:* 01/22/2008, *Contact:* Evelyn Sibbernsen 435-755-3620.

*EIS No. 20070529, Draft EIS, NCP, DC* , Smithsonian Institution National Museum of African American History and Culture, Construction and Operation, Between 14th and 15th Streets NW., and Constitution Avenue, NW., and Madison Drive, NW., Washington, DC, *Comment Period Ends:* 02/04/2008, *Contact:* Gene Keller 202-482-7251.

*EIS No. 20070530, Final EIS, COE, 00* , Wolf Creek Dam/Lake Cumberland Project, Emergency Measures in Response to Seepage, Mississippi River, South Central Kentucky and Central Tennessee, *Wait Period Ends:* 01/22/2008, *Contact:* Chip Hall 615-736-7666.

*EIS No. 20070531, Final EIS, AFS, MT* , Lolo National Forest Integrated Weed Management, To Establish Beneficial Vegetation and Weed Resistant Plant Communities, Missoula, Mineral, Sanders, Granite, Powell, Lewis and Clark, Flathead, Ravalli and Lake Counties, MT, *Wait Period Ends:* 01/22/2008, *Contact:* Andy Kulla 406-329-3962.

*EIS No. 20070532, Draft EIS, BLM, ID* , Three Rivers Stone Quarry Expansion Project, Proposing to Expand the Quarry Operation up to an Additional 73 Acres to Increase Mine Production of Flaystone, Custer County, ID, *Comment Period Ends:* 02/04/2008, *Contact:* Charles Horsburgh 208-524-7530.

*EIS No. 20070533, Second Draft Supplement, AFS, CA* , Watdog Project, Additional Clarification of Changes Between the Final EIS (2005) and Final Supplement EIS (2007), Feather River Ranger District, Plumas National Forest, Butte and Plumas Counties, CA, *Comment Period Ends:* 02/04/2008, *Contact:* Sharen Parker 530-534-6500.

*EIS No. 20070534, Draft EIS, AFS, ID* , Idaho Roadless Area Conservation Project, To Provide State-Specific Direction for the Conservation and Management of Inventoried Roadless Areas, National Forest System Lands in Idaho, *Comment Period Ends:* 03/13/2008, *Contact:* Brad Gilbert 208-765-7438.

*EIS No. 20070535, Final EIS, AFS, CA* , Horse Heli Project, Harvest Merchantable Timber, Thin Stands, Treat Fuels, and Conduct Associated Activities, Klamath National Forest, Oak Knoll Ranger District, Siskiyou County, CA, *Wait Period Ends:* 01/22/2008, *Contact:* Jan Ford 530-842-6131.

**Amended Notices**

*EIS No. 20070440, Draft EIS, FHW, UT* , Mountain View Corridor (MVC) Project, Proposed Transportation Improvement 2030 Travel Demand in Western Salt Lake County south of I-80 and west of Bangerter Highway and in northwestern Utah County of I-15, south of the Salt Lake County Line, and north of Utah Lake, Salt Lake and Utah County, UT , *Comment Period Ends:* 01/24/2008, *Contact:* Edward Woolford, P.E. 801-963-0182. Revision of FR Notice Published 10/26/2007: Extending Comment Period from 12/24/2007 to 01/24/2008.

Dated: December 18, 2007.

Robert W. Hargrove,

Director, NEPA Compliance Division, Office of Federal Activities.