Skip to content
LexBuild

Environmental Impacts Statements; Notice of Availability

---
identifier: "/us/fr/E8-31218"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Environmental Impacts Statements; Notice of Availability"
title_number: 0
title_name: "Federal Register"
section_number: "E8-31218"
section_name: "Environmental Impacts Statements; Notice of Availability"
positive_law: false
currency: "2009-01-02"
last_updated: "2009-01-02"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Environmental Protection Agency"
document_number: "E8-31218"
document_type: "notice"
publication_date: "2009-01-02"
agencies:
  - "Environmental Protection Agency"
fr_citation: "74 FR 106"
fr_volume: 74
docket_ids:
  - "ER-FRL-8589-1"
---

#  Environmental Impacts Statements; Notice of Availability

*Responsible Agency:* Office of Federal Activities, General Information (202) 564-1399 or *http://www.epa.gov/compliance/nepa/.*

Weekly receipt of Environmental Impact Statements

Filed 12/22/2008 Through 12/26/2008

Pursuant to 40 CFR 1506.9.

*EIS No. 20080535, Draft EIS, BLM, MT,* Indian Creek Mine Expansion, Proposed Mine Expansion would include Quarry Areas, Mine Facilities, Ore Storage Sites, Soil Salvage Stockpiles, Haul Roads, and Overburden Disposal Areas, Issuing Operating Permit #00105 and Plan of Operation #MTM78300, Broadwater County, MT, *Comment Period Ends:* 03/02/2009, *Contact:* David Williams 406-533-7655.

*EIS No. 20080536, Final EIS, COE, CA,* Berth 97-109 (China Shipping) Container Terminal Project, Construction and Operation, Issuance of section 404 (CWA) and Section 10 Rivers and Harbor Act Permits, Port of Los Angeles, Los Angeles County, CA, *Wait Period Ends:* 02/02/2009, *Contact:* Dr. Spencer D. MacNeil 805-585-2152.

*EIS No. 20080537, Draft EIS, BLM, NV,* Ely Energy Center, Construction and Operation 1500 MW Coal-Fired Power Plant and Associated Features, White Pine, Lincoln, Clark, Nye, Elko and Nevada Counties, NV, *Comment Period Ends:* 04/03/2009, *Contact:* Joe Incardine 801-524-3833.

*EIS No. 20080538, Second Draft Supplement, NRC, VA,* North Anna Power Station Unit 3, Combined License (COL) application for Construction and Operation a Based-Load Nuclear Power Plant, (NUREG-1917), in the Town of Mineral, Louisa County, VA, *Comment Period Ends:* 03/16/2009, *Contact:* Alicia Williamson 301-415-1878.

*EIS No. 20080539, Draft EIS, USA, 00,* Gulf of Mexico Range Complex (GOMEX), Proposed Action is to Support and Conduct Current and Emerging Training and RDT&E Operations, TX, MS, AL and FL, *Comment Period Ends:* 02/17/2009, *Contact:* Karen M. Foskey 703-602-2859.

*EIS No. 20080540, Draft EIS, AFS, ID,* Nez Perce National Forest (NPNF), Proposed Designated Routes and Areas for Motor Vehicle Use (DRMVU), Implementation, Idaho County, ID, *Comment Period Ends:* 02/25/2009, *Contact:* Alexandra Botello 208-983-1950.

*EIS No. 20080541, Final EIS, UPS, CA,* Aliso Viejo Incoming Mail Facility, Proposed Construction and Operation of a Mail Processing Facility on a 25-Acre Parcel, Aliso Viejo, Orange County, CA, *Wait Period Ends:* 02/02/2009, *Contact:* Emmy Andrews 650-615-7200.

*EIS No. 20080542, Draft EIS, AFS, NV,* Martin Basin Rangeland Project, Reauthorizing Grazing on Eight Existing Cattle and Horse Allotments: Bradshaw, Buffalo, Buttermilk, Granite Peak, Indian, Martin Basin, Rebel Creek, and West Side Flat Creek, Santa Rosa Ranger District, Humboldt-Toiyabe National Forest, NV, *Comment Period Ends:* 02/17/2009, *Contact:* Vern Keller 775-355-5356.

**Amended Notices**

*EIS No. 20080523, Draft EIS, BLM, 00,* UNEV Pipeline Project, Construction of a 399-mile Long Main Petroleum Products Pipeline, Salt Lake, Tooele, Juab, Millard, Iron, and Washington Counties, UT, and Lincoln and Clark Counties, NV, *Comment Period Ends:* 03/19/2009, *Contact:* Joe Incardine 801-524-3833. Revision to FR Notice  Published 12/19/2008: Correction to Title and Comment Period.

Dated: December 29, 2008.

Robert W. Hargrove,

Director, NEPA Compliance Division, Office of Federal Activities.