# Environmental Impact Statements; Notice of Availability
*Responsible Agency:* Office of Federal Activities, General Information (202) 564-1399 or *http://www.epa.gov/compliance/nepa/* .
Weekly receipt of Environmental Impact Statements
Filed 01/19/2009 Through 01/23/2009
Pursuant to 40 CFR 1506.9.
*EIS No. 20090016, Final EIS, FAA, MA,* New Bedford Regional Airport Improvements Project, To Enhance Aviation Capacity, Air Traffic, Jet Traffic, Air Cargo and General Aviation Traffic, Southeastern Massachusetts Region, City of New Bedford, Bristol County, MA, *Wait Period Ends:* 03/02/2009, *Contact:* Michelle Ricci 781-238-7631.
*EIS No. 20090017, Draft EIS, USN, GU,* Mariana Islands Range Complex (MIRC), To Address Ongoing and Proposed Military Training Activities, Mariana Islands, GU, *Comment Period Ends:* 03/16/2009, *Contact:* Nora Macariola-See 808-472-1402.
*EIS No. 20090018, Draft EIS, AFS, ID,* Lakeview-Reeder Fuels Reduction Project, Proposed Fuels Reduction and Road Treatment Activities, Idaho Panhandle National Forests, Priest Lake Ranger District, Bonner County, ID, *Comment Period Ends:* 03/16/2009, *Contact:* David Cobb 208-443-2512.
*EIS No. 20090019, Final EIS, FHW, 00,* Interstate 74 Quad Cities Corridor Study, Improvements to the I-74 between 23rd Avenue in Moline, IL and 53rd Street in Davenport, IA, NPDES, Rivers and Harbors Act Section 9 and US Army COE Section 404 Permits, Scott County, IA and Rock Island County, IL, *Wait Period Ends:* 03/16/2009, *Contact:* Philip Barnes 515-233-7300.
*EIS No. 20090020, Final EIS, AFS, WV,* Lower Williams Project Area (LWPA), Alternative 6 is the Preferred Alternative, Proposed to Perform Vegetation Management and Wildlife Habitat Improvements, Implementation, Gauley Ranger District, Monongahela National Forest, Webster County, WV, *Wait Period Ends:* 03/02/2009, *Contact:* David Ede 304-636-1800 Ext. 233.
*EIS No. 20090021, Draft EIS, AFS, CA,* Inyo National Forest Motorized Travel Management Project, Implementation, Inyo, Mineral, Mono and Esmeralda Counties, CA, *Comment Period Ends:* 03/30/2009, *Contact:* Susan Joyce 760-873-2516.
*EIS No. 20090022, Final EIS, AFS, WY,* Off-Highway Vehicle (OHV) Route Designation Project, Proposing to Improve Management of Public Summer Motorized Use (May 1-November 30) by Designating Roads and Motorized Trails, Bridger-Teton National Forest, Buffalo, Jackson and Big Piney Ranger Districts, Teton, Lincoln and Sublette Counties, WY, Wait *Period Ends:* 03/02/2009, *Contact:* Linda Merigliano 307-739-5400.
*EIS No. 20090023, Draft EIS, AFS, CA,* Sequoia National Forest Motorized Travel Management Project, Prohibit Cross-Country Travel for Managing Motorized Travel, Kern River, Western Divide Ranger Districts, Sequoia National Forest, Tulare County, CA , *Comment Period Ends:* 03/31/2009, *Contact:* Barbara Johnston 559-784-1500 Ext. 1220.
*EIS No. 20090024, Draft EIS, FHW, MO,* Interstate 70 Corridor Improvements, Kansas City to St. Louis, Updated Information, Evaluates if a Truck-Only Lane Strategy is Viable, Kansas City to St. Louis, MO, *Comment Period Ends:* 03/16/2009, *Contact:* Peggy Casey 573-636-7104.
*EIS No. 20090025, Draft EIS, IBR, CA,* Grassland Bypass Project 2010-2019 Project, Proposed new Use Agreement, San Joaquin River, CA, *Comment Period Ends:* 03/30/2009, *Contact:* Judi Tapia 559-487-5138.
*EIS No. 20090026, Draft EIS, FTA, CO,* East Corridor Project, Proposes Commuter Rail Transit from downtown Denver to International Airport (DIA), Denver, Adams, Arapahoe, Jefferson and Douglas Counties, CO, *Comment Period Ends:* 03/16/2009, *Contact:* Anthony Joseph Ossi, Jr. 202-366-1613.
**Amended Notices**
*EIS No. 20090001, Draft EIS, FHW, IA,* Southeast (SE) Connector in Des Moines, Iowa, To Provide a Safe and Efficient Link between the MLK Jr. Parkway at SE 14th Street to the U.S. 65 Bypass, Funding, U.S. Army COE Section 404 and NPDES Permits, Polk County, IA, *Comment Period Ends:* 03/02/2009, *Contact:* Philip Barnes 515-233-7300. Revision to FR Notice Published 1/16/2009: Correction to Status from Final to Draft.
*EIS No. 20090010, Draft EIS, USN, WA* —VOIDED—Swimmer Interdiction Security System (SISS) Project, Construction and Operation, Naval Bas Kitsap—Bangor, Silverdale, Kitsap County, WA, *Comment Period Ends:* 03/09/2009, *Contact:* Shannon Kasa 619-553-3889. This DEIS was inadvertently refilled and published in 01/23/2009 FR, the Correct DEIS # 20080531 was published on 12/29/2008.
*EIS No. 20090012, Final EIS, NOA, 00,* Proposed Acceptable Biological Catch (ABC) and Optimum Yield (OY) Specifications and Management Measures for the 2009-2010 Pacific Coast Groundfish Fishery Management Plan, Implementation, WA, OR and CA, *Wait Period Ends:* 02/23/2009, *Contact:* Barry Thom 503-231-6266. Revision to FR Notice Published 01/23/2009: Correction to Contact Person Name and Telephone.
*EIS No. 20090014, Final EIS, NOA, OR,* Bull Run Water Supply Habitat Conservation Plan, Application for and Incidental Take Permit to cover the Continued Operation and Maintenance, Sandy River Basin, City of Portland, OR, *Wait Period Ends:* 02/23/2009, *Contact:* Barry Thom, 503-231-6266 503-231-6266. Revision to FR Notice Published 01/23/2009: Correction to Contact Person Name and Telephone.
Dated: 01/27/2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.