# Environmental Impacts Statements; Notice of Availability
*Responsible Agency:* Office of Federal Activities, General Information (202) 564-1399 or *http://www.epa.gov/compliance/nepa/.* Weekly receipt of Environmental Impact Statements. Filed 10/31/2011 Through 11/04/2011 Pursuant to 40 CFR 1506.9.
**Notice**
Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA's comment letters on EIS are available at: *http://www.epa.gov/compliance/nepa/eisdata.html.*
*EIS No. 20110375, Final EIS, USFS, AK,* Coconino National Forest Travel Management Project, Proposes to Designate a System of Road and Motorized Travel, Implementation, Coconino and Yavapai County, AZ, *Review Period Ends:* 12/12/2011, *Contact:* Mike Dechter (928) 527-3416.
*EIS No. 20110376, Final EIS, USFS, AZ,* Pinaleno Ecosystem Restoration Project, Proposed On-the-Ground Treatments to Improve Forest Health and Improve or Protect Red Squirrel Habitat, Coronado National Forest, Graham County, AZ, *Review Period Ends:* 12/12/2011, *Contact:* Craig Wilcox (928) 348-1961.
*EIS No. 20110377, Final EIS, NOAA, 00,* Reef Fish Amendment 32, Gag—Rebuilding Plan, Annual Catch Limits, Management Measures, Red Grouper—Annual Catch Limits, Management Measures, Grouper Accountability Measures, Gulf of Mexico, *Review Period Ends:* 12/12/2011, *Contact:* Roy E. Crabtree (727) 824-5301.
*EIS No. 20110378, Draft EIS, FHWA, LA,* Tier 1—Baton Rouge Loop Toll Facility Project, Proposed as a 90 to 105 mile long Circumferential Controlled Access Free-Flow Toll Roadway with two new Mississippi River Crossings, in Parishes of Ascension, East Baton Rouge, Iberville, Livingston, and West Baton Rouge, LA, *Comment Period Ends:* 01/09/2012, *Contact:* Cark N, Highsmith (225) 757-7615.
*EIS No. 20110379, Draft EIS, USN, HI,* Basing of MV-22 and H-1 Aircraft in Support of III Marine Expeditionary Force (MEF) Elements, Construction and Renovation of Facilities to Accommodate and Maintain the Squadrons, HI, *Comment Period Ends:* 12/27/2011, *Contact:* John Bigay (808) 472-1196.
*EIS No. 20110380, Second Draft Supplement, NRC, TN,* Related to the Operation of Watts Bar Nuclear Plant Units 2, New and Updated Information, Operating License, Rhea County, TN, *Comment Period Ends:* 01/24/2012, *Contact:* Justin Poole (301) 415-2048.
*EIS No. 20110381, Draft EIS, WAPA, AZ,* Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, Implementation, Right-of-Way Application to the BLM, La Paz County, AZ, *Comment Period Ends:* 02/08/2012, *Contact:* Liana Reilly (720) 962-7253.
*EIS No. 20110382, Draft EIS, DOI, 00,* Programmatic EIS—Outer Continental Shelf Oil and Gas Leasing Program—2012-2017 in Six Planning Area, Western, Central and Eastern Gulf of Mexico, Cook Inlet, the Beaufort Sea, and the Chukchi Sea, *Comment Period Ends:* 01/09/2012, *Contact:* James F. Bennett (703) 787-1660.
**Amended Notices**
*EIS No. 20110332, Draft Supplement, USFS, MT,* Montanore Project, Additional Information on Alternatives, Proposes to Construct a Copper and Silver Underground Mine and Associated Facilities, Including a New Transmission Line, Plan-of-Operation Permit, Kootenai National Forest, Sanders County, MT, *Comment Period Ends:* 12/21/2011, *Contact:* Lynn Hagarty (406) 283-7642, Revision to FR Notice Published 10/07/2011: Extending Comment Period from 11/21/2011 to 12/21/2011.
Dated: November 7, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal Activities.