Skip to content
LexBuild

Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No. 25, LLC; Notice Announcing Preliminary Permit Drawing

---
identifier: "/us/fr/2012-4189"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No. 25, LLC; Notice Announcing Preliminary Permit Drawing"
title_number: 0
title_name: "Federal Register"
section_number: "2012-4189"
section_name: "Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No. 25, LLC; Notice Announcing Preliminary Permit Drawing"
positive_law: false
currency: "2012-02-23"
last_updated: "2012-02-23"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Energy Department"
document_number: "2012-4189"
document_type: "notice"
publication_date: "2012-02-23"
agencies:
  - "Energy Department"
  - "Federal Energy Regulatory Commission"
fr_citation: "77 FR 10740"
fr_volume: 77
docket_ids:
  - "Project Nos. 14261-000, 14268-000, 14277-000, 14281-000"
---

#  Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No. 25, LLC; Notice Announcing Preliminary Permit Drawing

The Commission has received four preliminary permit applications deemed filed on September 1, 2011, at 8:30 a.m., [^1] for proposed projects to be located at the U.S. Army Corps of Engineers' John C. Stennis Lock and Dam on the Tennessee-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund XVIII for Project No. 14261-000, Upper Hydroelectric, LLC for Project No. 14268-000, FFP Project 95, LLC for Project No. 14277-000, and Riverbank Hydro No. 25, LLC for Project No. 14281-000.

[^1] Under the Commission's Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011).

On February 28, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations. [^2] The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application.

[^2] 18 CFR 4.37 (2011).

The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing.

Dated: February 16, 2012.

Nathaniel J. Davis, Sr.,

Deputy Secretary.