Skip to content
LexBuild

Environmental Impacts Statements; Notice of Availability

---
identifier: "/us/fr/2012-8929"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Environmental Impacts Statements; Notice of Availability"
title_number: 0
title_name: "Federal Register"
section_number: "2012-8929"
section_name: "Environmental Impacts Statements; Notice of Availability"
positive_law: false
currency: "2012-04-13"
last_updated: "2012-04-13"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Environmental Protection Agency"
document_number: "2012-8929"
document_type: "notice"
publication_date: "2012-04-13"
agencies:
  - "Environmental Protection Agency"
fr_citation: "77 FR 22315"
fr_volume: 77
docket_ids:
  - "ER-FRL-9002-5"
---

#  Environmental Impacts Statements; Notice of Availability

*Responsible Agency:* Office of Federal Activities, General Information (202) 564-7146 or *http://www.epa.gov/compliance/nepa/.*

Weekly receipt of Environmental Impact Statements

Filed 04/02/2012 Through 04/06/2012

Pursuant to 40 CFR 1506.9

**Notice**

Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA's comment letters on EISs are available at: *http://www.epa.gov/compliance/nepa/eisdata.html.*

*EIS No. 20120098, Draft EIS, USAF, 00* , F-35A Operational Basing, Beddown and Operation of F-35A Aircraft for the Combat Air Forces at One or More Locations throughout the Contiguous U.S. from 2015 through 2020, *Comment Period Ends:* 06/04/2012, *Contact:* Nicholas Germanos 757-764-5994.

*EIS No. 20120099, Draft EIS, BLM, CA,* Desert Harvest Solar Project, Construction, Operation, Maintenance, and Decommissioning of a 150-megawatt Photovoltaic Solar Energy Facility and Generation-Intertie Transmission Line, Consideration of Issuance of a Right-of-Way Grant, Riverside County, CA, *Comment Period Ends:* 07/13/2012, *Contact:* Lynnette Elser 951-697-5233.

*EIS No. 20120100, Final EIS, NRC, WA,* Generic—License Renewal of Nuclear Plants, Supplement 47 Regarding Columbia Generating Station (NUREG-1437), Issuance of a Renewed Operating License for an Additional 20 Years, Benton County, WA, *Review Period Ends:* 05/14/2012, *Contact:* Paula Cooper 301-415-2323.

*EIS No. 20120101, Draft EIS, USACE, MS,* Pascagoula Lower Sound/Bayou Casotte Channel Widening, Issuance of a Permit to Dredge or Excavate Adjacent to a Federal Navigation Channel in or Affecting Navigable Waters of the U.S., Jackson County, MS, *Comment Period Ends:* 05/29/2012, *Contact:* Philip Hegji 251-690-3222.

*EIS No. 20120102, Final Supplement, USFS, MT,* Young Dodge Project, Proposed Timber Harvest and Associate Activities, Updated Information on the First 3 Alternatives, Prescribed Burning, Road and Recreation Management, Kootenai National Forest, Rexford Ranger District, Lincoln County, MT, *Review Period Ends:* 05/14/2012, *Contact:* Moira McKelvey 406-296-2536.

**Amended Notices**

*EIS No. 20120078, Second Draft Supplement, FHWA,* TX, Trinity Parkway Project, Construction of a Six-Lane Controlled Access Toll Facility from IH-35 E/TX-183 to US-175/TX-310, Additional Information on the Compatibility with Levee Remediation Plans for the Dallas Floodway and New Information on Historic Resources, U.S. Army COE Section 10 and 404 Permits, Dallas County, TX, *Comment Period Ends:* 05/18/2012, *Contact:* Salvador Deocampo 512-536-5950 Revision to FR Notice Published 03/23/2012: Extending Comment Period from 5/7/2012 to 5/18/2012.

Dated: April 10, 2012.

Cliff Rader,

Director, NEPA Compliance Division, Office of Federal Activities.