Skip to content
LexBuild

Small Generator Interconnection Agreements and Procedures

---
identifier: "/us/fr/2013-12079"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Small Generator Interconnection Agreements and Procedures"
title_number: 0
title_name: "Federal Register"
section_number: "2013-12079"
section_name: "Small Generator Interconnection Agreements and Procedures"
positive_law: false
currency: "2013-05-21"
last_updated: "2013-05-21"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Energy Department"
document_number: "2013-12079"
document_type: "proposed_rule"
publication_date: "2013-05-21"
agencies:
  - "Energy Department"
  - "Federal Energy Regulatory Commission"
cfr_references:
  - "18 CFR Part 35"
fr_citation: "78 FR 29672"
fr_volume: 78
docket_ids:
  - "Docket No. RM13-2-000"
effective_date: "2013-06-03"
fr_action: "Notice of Proposed Rulemaking; correction."
---

#  Small Generator Interconnection Agreements and Procedures

**AGENCY:**

Federal Energy Regulatory Commission.

**ACTION:**

Notice of Proposed Rulemaking; correction.

**SUMMARY:**

This document contains corrections to the proposed rule (RM13-2-000) which was published in the *Federal Register* of Friday, February 1, 2013 (78 FR 7524). The regulations revised the *pro forma* Small Generator Interconnection Procedures (SGIP) and *pro forma* Small Generator Interconnection Agreement (SGIA) originally set forth in Order No. 2006.

**DATES:**

Effective on [June 3, 2013].

**FOR FURTHER INFORMATION CONTACT:**

Leslie Kerr (Technical Information), Office of Energy Policy and Innovation, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-8540, *[email protected]* .

Monica Taba (Technical Information), Office of Electric Reliability, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-6789, *[email protected]* .

Elizabeth Arnold (Legal Information), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-8687, *[email protected]* .

**SUPPLEMENTARY INFORMATION:**

**Errata Notice**

On January 17, 2013, the Commission issued an order in the above-referenced docket. *Small Generator Interconnection Agreements and Procedures,* 142 FERC ¶ 61,049 (2013). The order is revised as follows:

The fourth sentence of paragraph 45 should read, “This requirement was included in Order No. 2006 <sup>62</sup> but was not made clear in the *pro forma* SGIP.”

Footnote 62 should read, “Order No. 2006, FERC Stats. & Regs. ¶ 31,180 at P 140.”

In FR Doc. 2013-01366 appearing on page 7523 in the *Federal Register* of Friday, February 1, 2013, the same corrections are made:

1. On page 7531, the fourth sentence of paragraph 45 should read, “This requirement was included in Order No. 2006 <sup>62</sup> but was not made clear in the *pro forma* SGIP.”

2. On page 7531, Footnote 62 should read, “Order No. 2006, FERC Stats. & Regs. ¶ 31,180 at P 140.”

Dated: April 25, 2013.

Kimberly D. Bose,

Secretary.