Skip to content
LexBuild

Notice of Correction on the Draft Environmental Impact Statement for the Four Corners Power Plant and Navajo Mine Energy Project

---
identifier: "/us/fr/2014-11898"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Notice of Correction on the Draft Environmental Impact Statement for the Four Corners Power Plant and Navajo Mine Energy Project"
title_number: 0
title_name: "Federal Register"
section_number: "2014-11898"
section_name: "Notice of Correction on the Draft Environmental Impact Statement for the Four Corners Power Plant and Navajo Mine Energy Project"
positive_law: false
currency: "2014-05-23"
last_updated: "2014-05-23"
format_version: "1.1.0"
generator: "[email protected]"
agency: "DEPARTMENT OF THE INTERIOR"
document_number: "2014-11898"
document_type: "notice"
publication_date: "2014-05-23"
agencies:
  - "DEPARTMENT OF THE INTERIOR"
  - "Office of Surface Mining Reclamation and Enforcement"
---

#  Notice of Correction on the Draft Environmental Impact Statement for the Four Corners Power Plant and Navajo Mine Energy Project

**AGENCY:**

Office of Surface Mining Reclamation and Enforcement (OSMRE), Interior.

**ACTION:**

Notice; correction.

**SUMMARY:**

On March 28, 2014 (79 FR 17569), OSMRE published a notice of availability (NOA) for the Four Corners Power Plant and Navajo Mine Energy Project draft environmental impact statement (DEIS). The DEIS included a copy of the United States Army Corps of Engineers (USACE) Preliminary Draft Permit Evaluation (Appendix C of the DEIS) with Attachments A through D omitted. OSMRE updated the online DEIS found at *http://www.wrcc.osmre.gov/initiatives/fourCorners.shtm* on May 2, 2014 to include the omitted Attachments A through D, and the USACE mailed Attachments A through D on May 5, 2014 to DEIS repositories identified in the March 28, 2014 (79 FR 17569) NOA for inclusion.

**FOR FURTHER INFORMATION CONTACT:**

Marcelo Calle, 303-293-5035.

Dated: May 16, 2014.

Joseph G. Pizarchik,