# Minneapolis Leased Housing Associates IV Limited Partnership; Notice of Application Tendered for Filing With the Commission
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. *Type of Application:* Minor License.
*b. Project No.:* 14628-001.
*c. Date filed:* March 20, 2015.
d. *Applicant:* Minneapolis Leased Housing Associates IV, Limited Partnership (Minneapolis Housing Associates).
e. *Name of Project:* A-Mill Artist Lofts Hydroelectric Project (A-Mill Project).
f. *Location:* On the Mississippi River, in the City of Minneapolis, Hennepin County, Minnesota. No federal lands are occupied by the project works or located within the project boundary.
g. *Filed Pursuant to:* Federal Power Act 16 U.S.C. 791(a)-825(r).
h. *Applicant Contact:* Owen Metz, 2905 Northwest Blvd., Suite 150, Plymouth, MN 55441; (763) 354-5618; email *[email protected].*
i. *FERC Contact:* Shana Murray at (202) 502-8333; or email at *[email protected].*
j. The application is not ready for environmental analysis at this time.
k. The A-Mill Project consists of: (1) Removal of an existing concrete bulkhead blocking the existing intake structure; (2) an existing headrace tunnel rehabilitated and sleeved with a new 616-foot-long, 5-foot-diameter steel penstock; (3) a new vertical steel pipe installed in the existing downstream drop-shaft; (4) a new 600-kilowatt turbine generator; (5) a new 6-foot-wide by 4-foot-tall concrete outlet structure at the existing downstream tailrace; and (6) appurtenant facilities. The average annual generation is estimated to be 3,400 megawatt-hours.
l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
m. *Procedural schedule:* The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate.
Issue Notice of Acceptance: April 2015.
Issue notice soliciting final terms and conditions: May 2015.
Commission issues EA: July 2015.
Dated: March 31, 2015.