Skip to content
LexBuild

Common Performance Metrics; Request for Information on Common Performance Metrics for RTOs and ISOs and Utilities Outside RTO and ISO Regions

---
identifier: "/us/fr/2015-20743"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Common Performance Metrics; Request for Information on Common Performance Metrics for RTOs and ISOs and Utilities Outside RTO and ISO Regions"
title_number: 0
title_name: "Federal Register"
section_number: "2015-20743"
section_name: "Common Performance Metrics; Request for Information on Common Performance Metrics for RTOs and ISOs and Utilities Outside RTO and ISO Regions"
positive_law: false
currency: "2015-08-21"
last_updated: "2015-08-21"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Energy Department"
document_number: "2015-20743"
document_type: "notice"
publication_date: "2015-08-21"
agencies:
  - "Energy Department"
  - "Federal Energy Regulatory Commission"
fr_citation: "80 FR 50847"
fr_volume: 80
docket_ids:
  - "Docket No. AD14-15-000"
---

#  Common Performance Metrics; Request for Information on Common Performance Metrics for RTOs and ISOs and Utilities Outside RTO and ISO Regions

On August 26, 2014, Commission Staff issued a “Common Metrics Report,” establishing 30 common metrics for independent system operators (ISOs), regional transmission organizations (RTOs), and utilities in non-ISO/RTO regions. In that report, Commission Staff indicated that upon approval by the Office of Management and Budget (OMB) for additional data collection, a notice would be issued requesting that the ISOs, RTOs, and participating utilities in non-ISO/RTO regions provide performance  information on the common metrics on a schedule to be specified in the notice. [^1]

[^1]*Common Metrics Commission Staff Report,* Docket No. AD14-15-000, at 4 (Aug. 26, 2014).

Consistent with the OMB-approved data collection [^2] and past practice regarding this effort, ISOs, RTOs, and utilities in non-ISO/RTO regions are encouraged to submit information responsive to the 30 common metrics listed in the August 2014 report. Information submitted should cover the 2010-2014 period, and should be submitted by October 30, 2015. [^3] Commission staff plans to contact representatives of the ISOs, RTOs, and utilities in non-ISO/RTO regions that have previously participated in this effort.

[^2] On August 6, 2015, OMB approved a request for reinstatement and revision of information collection FERC-922, “Performance Metrics for ISOs, RTOs and Regions Outside ISOs and RTOs” (OMB Control No. 1902-0262).

[^3] Information should be submitted in docket no. AD14-15-000. Submissions must be formatted and filed in accordance with the submission guidelines described at: *http://www.ferc.gov/resources/guides/submission-guide.asp.* Submissions must be in an acceptable file format as described at: *http://www.ferc.gov/docs-filing/elibrary/accept-file-formats.asp.* The numeric values corresponding to all charts and tables containing metrics must be submitted in an accompanying file, in one of the following formats: Microsoft Office 2003/2007/2010: Excel (.xls or .xlsx), or ASCII Comma Separated Value (.csv).

For further information, please contact: Eric Krall, Office of Energy Market Regulation, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-6180, *[email protected].*

Dated: August 17, 2015.

Kimberly D. Bose,

Secretary.