Skip to content
LexBuild

Availability of a Draft Feasibility Study With Integrated Environmental Impact Statement (EIS), Ala Wai Canal Project, Oahu, HI

---
identifier: "/us/fr/2015-24771"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Availability of a Draft Feasibility Study With Integrated Environmental Impact Statement (EIS), Ala Wai Canal Project, Oahu, HI"
title_number: 0
title_name: "Federal Register"
section_number: "2015-24771"
section_name: "Availability of a Draft Feasibility Study With Integrated Environmental Impact Statement (EIS), Ala Wai Canal Project, Oahu, HI"
positive_law: false
currency: "2015-09-30"
last_updated: "2015-09-30"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Defense Department"
document_number: "2015-24771"
document_type: "notice"
publication_date: "2015-09-30"
agencies:
  - "Defense Department"
  - "Engineers Corps"
fr_citation: "80 FR 58724"
fr_volume: 80
fr_action: "Notice; extension of comment period."
---

#  Availability of a Draft Feasibility Study With Integrated Environmental Impact Statement (EIS), Ala Wai Canal Project, Oahu, HI

**AGENCY:**

Department of the Army, U.S. Army Corps of Engineers, DoD.

**ACTION:**

Notice; extension of comment period.

**SUMMARY:**

The comment period for the Draft Feasibility Study With Integrated Environmental Impact Statement (EIS), Ala Wai Canal Project, Oahu, HI published in the *Federal Register* on Friday, August 21, 2015 (80 FR 50832), required comments be submitted by October 7, 2015. The comment period has been extended to November 9, 2015.

**FOR FURTHER INFORMATION CONTACT:**

Mr. Derek Chow, U.S. Army Corps of Engineers, Honolulu District, 808-835-4026 or via email at *[email protected]* .

Brenda S. Bowen,

Army Federal Register Liaison Officer.