Skip to content
LexBuild

Availability of a Final Integrated Feasibility Report (Feasibility Study/Environmental Impact Statement/Environmental Impact Report), Los Angeles River Ecosystem Restoration Study, City of Los Angeles, Los Angeles County, CA

---
identifier: "/us/fr/2015-26886"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Availability of a Final Integrated Feasibility Report (Feasibility Study/Environmental Impact Statement/Environmental Impact Report), Los Angeles River Ecosystem Restoration Study, City of Los Angeles, Los Angeles County, CA"
title_number: 0
title_name: "Federal Register"
section_number: "2015-26886"
section_name: "Availability of a Final Integrated Feasibility Report (Feasibility Study/Environmental Impact Statement/Environmental Impact Report), Los Angeles River Ecosystem Restoration Study, City of Los Angeles, Los Angeles County, CA"
positive_law: false
currency: "2015-10-22"
last_updated: "2015-10-22"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Defense Department"
document_number: "2015-26886"
document_type: "notice"
publication_date: "2015-10-22"
agencies:
  - "Defense Department"
  - "Engineers Corps"
fr_citation: "80 FR 63973"
fr_volume: 80
fr_action: "Notice; extension of comment period."
---

#  Availability of a Final Integrated Feasibility Report (Feasibility Study/Environmental Impact Statement/Environmental Impact Report), Los Angeles River Ecosystem Restoration Study, City of Los Angeles, Los Angeles County, CA

**AGENCY:**

Department of the Army, U.S. Army Corps of Engineers, DoD.

**ACTION:**

Notice; extension of comment period.

**SUMMARY:**

The comment period for the Final Integrated Feasibility Report (Feasibility Study/Environmental Impact Statement/Environmental Impact Report), Los Angeles River Ecosystem Restoration Study, City of Los Angeles, Los Angeles County, CA published in the *Federal Register* on Friday, September 25, 2015 (80 FR 57795) and required comments be submitted by October 24, 2015. The comment period has been extended to November 1, 2015.

**FOR FURTHER INFORMATION CONTACT:**

Ms. Eileen Takata, U.S. Army Corps of Engineers, Los Angeles District, *[email protected]* OR Ms. Erin Jones, U.S. Army Corps of Engineers, Los Angeles District, *[email protected].*

**SUPPLEMENTARY INFORMATION:**

None.

Kirk E. Gibbs,

Colonel, U.S. Army, Commander and District Engineer.