Skip to content
LexBuild

Martin Marietta Materials, Inc.-Acquisition of Control Exemption-Rock & Rail LLC

---
identifier: "/us/fr/2015-30341"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Martin Marietta Materials, Inc.-Acquisition of Control Exemption-Rock & Rail LLC"
title_number: 0
title_name: "Federal Register"
section_number: "2015-30341"
section_name: "Martin Marietta Materials, Inc.-Acquisition of Control Exemption-Rock & Rail LLC"
positive_law: false
currency: "2015-12-01"
last_updated: "2015-12-01"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Transportation Department"
document_number: "2015-30341"
document_type: "notice"
publication_date: "2015-12-01"
agencies:
  - "Transportation Department"
  - "Surface Transportation Board"
fr_citation: "80 FR 75163"
fr_volume: 80
docket_ids:
  - "Docket No. FD 35966"
fr_action: "Correction to notice of exemption."
---

#  Martin Marietta Materials, Inc.—Acquisition of Control Exemption—Rock & Rail LLC

**AGENCY:**

Surface Transportation Board, DOT.

**ACTION:**

Correction to notice of exemption.

On October 9, 2015, Martin Marietta Materials, Inc. (MMM), a noncarrier, filed a verified notice of exemption to acquire control of Rock & Rail, Inc. (RRI), a Class III railroad. On October 23, 2015, notice of the exemption was served and published in the *Federal Register* (80 FR 64,491). The exemption became effective November 8, 2015.

On November 4, 2015, MMM filed a letter with the Board advising that the notice requires clarification. According to MMM, RRI also owns and operates rail lines in Colorado Springs, Colo. [^1] MMM states that all of the rail lines owned and operated by RRI are in Colorado and do not connect, nor are there plans to connect, with the railroads controlled by MMM. MMM also clarifies that the correct legal name of RRI is “Rock & Rail LLC.” This notice corrects the information described above and the case caption. All other information in the notice is correct.

[^1] MMM states that RRI obtained Board authority in *Rock & Rail, Inc.—Acquis. and Operation Exemption—Railroad Lines near Kelker, El Paso Cty., Colo.,* FD 33764 (STB served June 25, 1999).

Board decisions and notices are available on our Web site at “ *WWW.STB.DOT.GOV.”*

By the Board, Rachel D. Campbell, Director, Office of Proceedings.

Decided: November 24, 2015.

Tia Delano,

Clearance Clerk.