Skip to content
LexBuild

Air Plan Approval; New Hampshire; Infrastructure Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standards; Correction

---
identifier: "/us/fr/2017-09028"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Air Plan Approval; New Hampshire; Infrastructure Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standards; Correction"
title_number: 0
title_name: "Federal Register"
section_number: "2017-09028"
section_name: "Air Plan Approval; New Hampshire; Infrastructure Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standards; Correction"
positive_law: false
currency: "2017-05-05"
last_updated: "2017-05-05"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Environmental Protection Agency"
document_number: "2017-09028"
document_type: "rule"
publication_date: "2017-05-05"
agencies:
  - "Environmental Protection Agency"
cfr_references:
  - "40 CFR Part 52"
fr_citation: "82 FR 21123"
fr_volume: 82
docket_ids:
  - "EPA-R01-OAR-2012-0950"
  - "FRL-9959-68-Region 1"
effective_date: "2017-05-05"
fr_action: "Final rule; correcting amendment."
---

#  Identification of plan.

**AGENCY:**

Environmental Protection Agency, (EPA).

**ACTION:**

Final rule; correcting amendment.

**SUMMARY:**

The Environmental Protection Agency (EPA) published a final rule approving a New Hampshire's State Implementation Plan (SIP) submissions that addressed infrastructure requirements of the Clean Air Act (CAA or Act) for the 2010 sulfur dioxide (SO <sub>2</sub> ) National Ambient Air Quality Standards (NAAQS) in the *Federal Register* on July 8, 2016. An error in the nonregulatory table in New Hampshire's SIP is identified and corrected in this action.

**DATES:**

This rule is effective May 5, 2017.

**FOR FURTHER INFORMATION CONTACT:**

Ida E. McDonnell, Manager, Air Permits, Toxics, and Indoor Programs Unit, Office of Ecosystem Protection, U.S. Environmental Protection Agency, EPA New England Regional Office, 5 Post Office Square, Suite 100, (OEP05-2), Boston, MA 02109-3912, phone number (617) 918-1653, fax number (617) 918-0653, email *[email protected].*

**SUPPLEMENTARY INFORMATION:**

EPA issued a final rule in the *Federal Register* on July 8, 2016 (81 FR 44542). An error occurred in the amendatory instructions to the table in 40 CFR 52.1520(e). The table entry for “Infrastructure SIP for the 2010 NO <sub>2</sub> NAAQS” was unintentionally removed and later restored. This corrective action adds an entry for “Infrastructure SIP for the 2010 SO <sub>2</sub> NAAQS” to the table in 40 CFR 52.1520(e), as was originally intended.

**List of Subjects in 40 CFR Part 52**

Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Reporting and recordkeeping requirements, Sulfur oxides.

Dated: March 16, 2017.

Deborah A. Szaro,

Acting Regional Administrator, EPA New England.

**Correction**

In final rule FR Doc. 2016-15623, published in the issue of Friday, July 8, 2016 (81 FR 44542), make the following correction:

On page 44553, in the third column, remove amendatory instruction 3.

Part 52 of chapter I, title 40 of the Code of Federal Regulations is corrected by making the following correcting amendment:

**PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS**

**40 CFR Part 52**

1. The authority citation for part 52 continues to read as follows:

**Authority:**

42 U.S.C. 7401 *et seq.*

**Subpart EE—New Hampshire**

**40 CFR Part 52**

2. In § 52.1520, the table in paragraph (e) is amended by adding the entry “Infrastructure SIP for the 2010 SO <sub>2</sub> NAAQS” after the entry “Infrastructure SIP for the 2010 SO <sub>2</sub> NAAQS” to read as follows:

§ 52.1520

(e) * * *

| Name of nonregulatory SIP provision | Applicable geographic | State submittal date/effective date | EPA approved date | Explanations |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| *         *         *         *         *         *         * |  |  |  |  |
| Infrastructure SIP for the 2010 SO
                                    
                                     NAAQS | Statewide | 9/13/2013 | 7/8/2016, 81 FR 44553 | Approved submittal, except for certain aspects relating to PSD which were conditionally approved. See 52.1519. |
|  |  |  |  |  |
| *         *         *         *         *         *         * |  |  |  |  |